Skip to content

Future changes to INSAR_ISCE_BURST jobs #2957

@asjohnston-asf

Description

@asjohnston-asf

A future release will include these changes to the outputs of INSAR_ISCE_BUSRT jobs to align them with the outputs of INSAR_ISCE_MULTI_BURST jobs run for the same bursts:

INSAR_ISCE_BURST jobs were made available in Nov 2023, allowing an interferogram to be created from a single Sentinel-1 reference burst and a single Sentinel-1 secondary burst. In Feb 2024 these products were updated to include several radar coordinate GeoTIFFs to support mosaicing several contiguous interferograms and redoing phase unwrapping to produce a single interferogram with a larger spatial extent.

INSAR_ISCE_MULTI_BURST jobs were made available in Mar 2025, allowing an interferogram to be created from a set of one or more contiguous reference bursts and a corresponding set of contiguous secondary bursts. This InSAR workflow spatially mosaics the Sentinel-1 bursts prior to interferometry, and is now the preferred method for creating interferograms with a spatial extent larger than a single burst.

These upcoming changes to INSAR_ISCE_BURST outputs reflect that the workflow for merging single-burst interferograms after the fact is no longer recommended or supported, and aligns the two job types so single-burst jobs can be submitted using either job type and will produce the same output.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions