Skip to content

Update pipeline to run with OTP 27 #261

Update pipeline to run with OTP 27

Update pipeline to run with OTP 27 #261

Triggered via push May 15, 2025 22:41
Status Failure
Total duration 1m 12s
Artifacts

erlang.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (25.2.1, 3.20.0)
Process completed with exit code 1.
build (27.3.4, 3.24.0)
The operation was canceled.
build (27.3.4, 3.24.0)
The strategy configuration was canceled because "build._25_2_1_3_20_0" failed