Skip to content

Commit d14ff97

Browse files
Merge pull request #9 from AmedeoPelliccia/copilot/update-stakeholder-knot-config
Implement AMPEL360-SPACE-T-PORTAL: stakeholder-centric navigation with automated generation
2 parents fc3e955 + f7b75ed commit d14ff97

File tree

583 files changed

+16578
-1
lines changed

Some content is hidden

Large Commits have some content hidden by default. Use the searchbox below for content that may be hidden.

583 files changed

+16578
-1
lines changed
Lines changed: 112 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,112 @@
1+
---
2+
title: "AMPEL360-SPACE-T-PORTAL — Stakeholder Entry Points"
3+
type: IDX
4+
variant: "SPACET"
5+
status: Draft
6+
bucket: "00"
7+
lc_or_subbucket: "LC01"
8+
description: "Primary navigation index for stakeholder workspaces (entrypoints + execution lanes) in AMPEL360 Space-T."
9+
owner: "Configuration Management WG"
10+
---
11+
12+
# AMPEL360-SPACE-T-PORTAL — Stakeholder Entry Points
13+
14+
This index provides the **single, GitHub-navigable entry point** to each stakeholder workspace under **AMPEL360-SPACE-T-PORTAL/**.
15+
16+
Conventions:
17+
- Each stakeholder has a dedicated folder: `STK_<ID>-<slug>/`
18+
- Each folder contains one canonical entrypoint file: `00_00_IDX_LC01_SPACET_stakeholder-<id>-entrypoint_v01.md`
19+
- Stakeholder work is organized by **KNOTS/****ATA_TASKS/** → ATA-specific IDXs.
20+
21+
---
22+
23+
## Stakeholders
24+
25+
### CM — Configuration Management
26+
- Entry point: [CM — Configuration Management](STK_CM-cm-configuration-management/00_00_IDX_LC01_SPACET_stakeholder-cm-entrypoint_v01.md)
27+
_Comment:_ Governance spine (nomenclature, baselines, change control, approvals, CI enforcement). Owns closure discipline.
28+
- Workspace: [STK_CM-cm-configuration-management/](STK_CM-cm-configuration-management/)
29+
_Comment:_ CM execution lanes, decisions, registers, and PR gatekeeping.
30+
31+
### PMO — Program Management Office
32+
- Entry point: [PMO — Program Management Office](STK_PMO-pmo-program-management-office/00_00_IDX_LC01_SPACET_stakeholder-pmo-entrypoint_v01.md)
33+
_Comment:_ Program cadence, milestones, resourcing, and portfolio prioritization of knots.
34+
- Workspace: [STK_PMO-pmo-program-management-office/](STK_PMO-pmo-program-management-office/)
35+
_Comment:_ Delivery pathways, schedules, and program-level reporting.
36+
37+
### SE — Systems Engineering
38+
- Entry point: [SE — Systems Engineering](STK_SE-se-systems-engineering/00_00_IDX_LC01_SPACET_stakeholder-se-entrypoint_v01.md)
39+
_Comment:_ System architecture, ICDs, requirements decomposition, and cross-ATA interfaces.
40+
- Workspace: [STK_SE-se-systems-engineering/](STK_SE-se-systems-engineering/)
41+
_Comment:_ Interface governance and system-level assurance artifacts.
42+
43+
### SAF — Safety
44+
- Entry point: [SAF — Safety](STK_SAF-saf-safety/00_00_IDX_LC01_SPACET_stakeholder-saf-entrypoint_v01.md)
45+
_Comment:_ Safety processes, hazard logs, safety cases, and evidence expectations (air/space worthiness).
46+
- Workspace: [STK_SAF-saf-safety/](STK_SAF-saf-safety/)
47+
_Comment:_ Safety knots, ATA linkages, and closure verification.
48+
49+
### CERT — Certification & Authorities
50+
- Entry point: [CERT — Certification & Authorities](STK_CERT-cert-certification-authorities/00_00_IDX_LC01_SPACET_stakeholder-cert-entrypoint_v01.md)
51+
_Comment:_ Authority engagement, compliance mapping, evidence packaging rules, audit readiness.
52+
- Workspace: [STK_CERT-cert-certification-authorities/](STK_CERT-cert-certification-authorities/)
53+
_Comment:_ Compliance pathways and evidence acceptance criteria.
54+
55+
### OPS — Operations
56+
- Entry point: [OPS — Operations](STK_OPS-ops-operations/00_00_IDX_LC01_SPACET_stakeholder-ops-entrypoint_v01.md)
57+
_Comment:_ Operational concepts, procedures, mission profiles, operational constraints and feedback loops.
58+
- Workspace: [STK_OPS-ops-operations/](STK_OPS-ops-operations/)
59+
_Comment:_ Ops-driven knots and operational readiness evidence.
60+
61+
### SPACEPORT — Spaceport/Airport Ops
62+
- Entry point: [SPACEPORT — Spaceport/Airport Ops](STK_SPACEPORT-spaceport-spaceport-airport-ops/00_00_IDX_LC01_SPACET_stakeholder-spaceport-entrypoint_v01.md)
63+
_Comment:_ Off-board infrastructure coupling (ground ops, turnaround, fueling/servicing interfaces, constraints).
64+
- Workspace: [STK_SPACEPORT-spaceport-spaceport-airport-ops/](STK_SPACEPORT-spaceport-spaceport-airport-ops/)
65+
_Comment:_ Infrastructure-driven uncertainties and adoption pathways.
66+
67+
### MRO — MRO / Maintenance
68+
- Entry point: [MRO — MRO / Maintenance](STK_MRO-mro-mro-maintenance/00_00_IDX_LC01_SPACET_stakeholder-mro-entrypoint_v01.md)
69+
_Comment:_ Maintainability, servicing, inspection, and evidence trails for continued air/space worthiness.
70+
- Workspace: [STK_MRO-mro-mro-maintenance/](STK_MRO-mro-mro-maintenance/)
71+
_Comment:_ Maintenance knots, tasking, and artifact readiness.
72+
73+
### DATA — Data Governance
74+
- Entry point: [DATA — Data Governance](STK_DATA-data-data-governance/00_00_IDX_LC01_SPACET_stakeholder-data-entrypoint_v01.md)
75+
_Comment:_ SSOT definitions, schema governance, identifier discipline, data quality and stewardship.
76+
- Workspace: [STK_DATA-data-data-governance/](STK_DATA-data-data-governance/)
77+
_Comment:_ Registry ownership, dedup policies, and cross-ATA adoption controls.
78+
79+
### AI — AI/ML Engineering
80+
- Entry point: [AI — AI/ML Engineering](STK_AI-ai-ai-ml-engineering/00_00_IDX_LC01_SPACET_stakeholder-ai-entrypoint_v01.md)
81+
_Comment:_ ML lifecycle, dataset/model governance, automated validation, TEKNIA/NKU instrumentation.
82+
- Workspace: [STK_AI-ai-ai-ml-engineering/](STK_AI-ai-ai-ml-engineering/)
83+
_Comment:_ AI execution lane (KNOTS/ → ATA partitioning → evidence packs).
84+
85+
### CY — Cybersecurity
86+
- Entry point: [CY — Cybersecurity](STK_CY-cy-cybersecurity/00_00_IDX_LC01_SPACET_stakeholder-cy-entrypoint_v01.md)
87+
_Comment:_ Threat models, security requirements, secure-by-design controls, vulnerability governance (incl. SBOM coupling).
88+
- Workspace: [STK_CY-cy-cybersecurity/](STK_CY-cy-cybersecurity/)
89+
_Comment:_ Security knots and policy gates linked to CI enforcement.
90+
91+
### TEST — IVVQ / Testing
92+
- Entry point: [TEST — IVVQ / Testing](STK_TEST-test-ivvq-testing/00_00_IDX_LC01_SPACET_stakeholder-test-entrypoint_v01.md)
93+
_Comment:_ Verification strategy, test evidence nodes (100+), qualification readiness, reproducible evidence chains.
94+
- Workspace: [STK_TEST-test-ivvq-testing/](STK_TEST-test-ivvq-testing/)
95+
_Comment:_ Test campaigns, evidence packs, and trace closure routines.
96+
97+
---
98+
99+
## How to use this portal (minimum workflow)
100+
101+
1. Start from your stakeholder entrypoint.
102+
2. Navigate to `KNOTS/` and select the active Knot (e.g., K06).
103+
3. Inside the Knot, use `ATA_TASKS/` and open the relevant ATA tasklist (IDX).
104+
4. Close uncertainty by partitions (IDs/Schema/Exports/CI/Evidence/Decisions/Adoption), then update NKU ledgers.
105+
106+
---
107+
108+
## Active knots (optional curated shortcuts)
109+
110+
- K06 — Data Governance (SSOT / Schemas / Identifiers)
111+
- AI lane: [STK_AI K06](STK_AI-ai-ai-ml-engineering/KNOTS/K06_data-governance-ssot-schemas-identifiers/)
112+
- Master K06 index: [K06 master index](STK_AI-ai-ai-ml-engineering/KNOTS/K06_data-governance-ssot-schemas-identifiers/00_00_IDX_LC01_SPACET_k06-data-governance-ssot-schemas-identifiers_v01.md)
Lines changed: 48 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,48 @@
1+
knot_id,title,stakeholder_id,affected_atas
2+
K01,certification-authority-basis,CM,"00;01;04;05;18;20;21;22;24;26;27;28;42;100;109;115"
3+
K04,integration-boundaries-and-icds,CM,"00;06;22;23;24;27;40;42;46;71;73;76;83;111"
4+
K06,data-governance-ssot-schemas-identifiers,CM,"00;06;31;45;46;90;91;93;94;95;99;101;107;109"
5+
K08,dpp-sbom-provenance-scope,CM,"00;85;93;94;95;98;99"
6+
K10,industrialization-supplychain-quality,CM,"00;05;10;20;51;70;80;82;89;100;115"
7+
K01,certification-authority-basis,PMO,"00;01;04;05;18;20;21;22;24;26;27;28;42;100;109;115"
8+
K02,conops-mission-phases,PMO,"01;02;09;10;18;21;22;27;34;100;102;112"
9+
K10,industrialization-supplychain-quality,PMO,"00;05;10;20;51;70;80;82;89;100;115"
10+
K14,reliability-growth-maintenance-intervals-health,PMO,"05;08;45;77;79;88;108;113"
11+
K02,conops-mission-phases,SE,"01;02;09;10;18;21;22;27;34;100;102;112"
12+
K04,integration-boundaries-and-icds,SE,"00;06;22;23;24;27;40;42;46;71;73;76;83;111"
13+
K05,model-fidelity-verification-credit,SE,"05;06;07;08;18;21;22;24;27;32;53;57;100;101;109;110;113"
14+
K06,data-governance-ssot-schemas-identifiers,SE,"00;06;31;45;46;90;91;93;94;95;99;101;107;109"
15+
K14,reliability-growth-maintenance-intervals-health,SE,"05;08;45;77;79;88;108;113"
16+
K01,certification-authority-basis,SAF,"00;01;04;05;18;20;21;22;24;26;27;28;42;100;109;115"
17+
K03,hazmat-cryo-propellants-safety-case,SAF,"12;18;26;28;47;78;81;84;110"
18+
K05,model-fidelity-verification-credit,SAF,"05;06;07;08;18;21;22;24;27;32;53;57;100;101;109;110;113"
19+
K11,human-factors-training-readiness,SAF,"01;09;10;11;12;18;25;44;84;112"
20+
K12,nvh-metrics-corridors-exposure,SAF,"18;61;78;110;112"
21+
K01,certification-authority-basis,CERT,"00;01;04;05;18;20;21;22;24;26;27;28;42;100;109;115"
22+
K05,model-fidelity-verification-credit,CERT,"05;06;07;08;18;21;22;24;27;32;53;57;100;101;109;110;113"
23+
K10,industrialization-supplychain-quality,CERT,"00;05;10;20;51;70;80;82;89;100;115"
24+
K02,conops-mission-phases,OPS,"01;02;09;10;18;21;22;27;34;100;102;112"
25+
K09,infrastructure-permitting-jurisdiction,OPS,"09;12;80;81;83;84;87;89;110"
26+
K11,human-factors-training-readiness,OPS,"01;09;10;11;12;18;25;44;84;112"
27+
K12,nvh-metrics-corridors-exposure,OPS,"18;61;78;110;112"
28+
K14,reliability-growth-maintenance-intervals-health,OPS,"05;08;45;77;79;88;108;113"
29+
K09,infrastructure-permitting-jurisdiction,SPACEPORT,"09;12;80;81;83;84;87;89;110"
30+
K03,hazmat-cryo-propellants-safety-case,SPACEPORT,"12;18;26;28;47;78;81;84;110"
31+
K11,human-factors-training-readiness,SPACEPORT,"01;09;10;11;12;18;25;44;84;112"
32+
K10,industrialization-supplychain-quality,SPACEPORT,"00;05;10;20;51;70;80;82;89;100;115"
33+
K10,industrialization-supplychain-quality,MRO,"00;05;10;20;51;70;80;82;89;100;115"
34+
K14,reliability-growth-maintenance-intervals-health,MRO,"05;08;45;77;79;88;108;113"
35+
K11,human-factors-training-readiness,MRO,"01;09;10;11;12;18;25;44;84;112"
36+
K06,data-governance-ssot-schemas-identifiers,DATA,"00;06;31;45;46;90;91;93;94;95;99;101;107;109"
37+
K08,dpp-sbom-provenance-scope,DATA,"00;85;93;94;95;98;99"
38+
K13,cybersecurity-zones-key-management,DATA,"23;46;83;87;90;94;98;103;111"
39+
K07,ai-autonomy-assurance-monitoring,AI,"22;27;42;90;96;114"
40+
K06,data-governance-ssot-schemas-identifiers,AI,"00;06;31;45;46;90;91;93;94;95;99;101;107;109"
41+
K13,cybersecurity-zones-key-management,AI,"23;46;83;87;90;94;98;103;111"
42+
K13,cybersecurity-zones-key-management,CY,"23;46;83;87;90;94;98;103;111"
43+
K06,data-governance-ssot-schemas-identifiers,CY,"00;06;31;45;46;90;91;93;94;95;99;101;107;109"
44+
K09,infrastructure-permitting-jurisdiction,CY,"09;12;80;81;83;84;87;89;110"
45+
K05,model-fidelity-verification-credit,TEST,"05;06;07;08;18;21;22;24;27;32;53;57;100;101;109;110;113"
46+
K10,industrialization-supplychain-quality,TEST,"00;05;10;20;51;70;80;82;89;100;115"
47+
K14,reliability-growth-maintenance-intervals-health,TEST,"05;08;45;77;79;88;108;113"
48+
K12,nvh-metrics-corridors-exposure,TEST,"18;61;78;110;112"
Lines changed: 113 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,113 @@
1+
---
2+
title: "Stakeholder Entry Point: AI/ML Engineering (AI)"
3+
type: IDX
4+
variant: "SPACET"
5+
status: Draft
6+
stakeholder_id: "AI"
7+
bucket: "00"
8+
lc_or_subbucket: "LC01"
9+
description: "Primary entry point for AI/ML Engineering in AMPEL360 Space-T. Navigate knots, ATA partitions, NKU control, and TEKNIA sharing gates."
10+
owner: "STK_AI Lead"
11+
---
12+
13+
# Stakeholder Entry Point — AI/ML Engineering (AI)
14+
15+
This page is the **stakeholder-centric entry point** for the AI/ML Engineering lane within **AMPEL360-SPACE-T-PORTAL/**.
16+
Work is organized by **Backlog Knots** (partitioned uncertainty knots). Each knot is resolved through **ATA-partitioned tasklists** and credited via **NKU progress**.
17+
18+
---
19+
20+
## 1) Scope
21+
22+
AI/ML Engineering (STK_AI) owns and/or contributes to:
23+
- ML lifecycle governance (datasets, models, evaluation, drift monitoring)
24+
- Schema alignment for AI-related data (canonical models, feature schemas, telemetry schemas)
25+
- Traceability instrumentation for evidence (training, evaluation, verification, and deployment)
26+
- TEKNIA packaging gates for shareable knowledge and certifiable hybrid artifacts
27+
- Automation (CI checks, validators, scaffolding, and agent instruction enforcement)
28+
29+
---
30+
31+
## 2) Navigation Rules
32+
33+
- **KNOTS/** is the top-level backlog structure (one folder per knot).
34+
- Each knot contains:
35+
- **one overview index** (IDX) describing scope and closure criteria,
36+
- **ATA_TASKS/** with one ATA-specific IDX per impacted ATA,
37+
- evidence/decisions/exports subtrees (as defined by the ATA tasklist index structure).
38+
- Closure requires **Decision + Evidence** and a baseline/trace update routed through **CM**.
39+
40+
---
41+
42+
## 3) Active Backlog Knots (GitHub-navigable)
43+
44+
### K06 — Data Governance (SSOT / Schemas / Identifiers)
45+
- Knot folder: [K06_data-governance-ssot-schemas-identifiers/](KNOTS/K06_data-governance-ssot-schemas-identifiers/)
46+
_Comment:_ Program-wide SSOT, schema governance, identifier discipline, trace semantics, DPP/BOM export integrity.
47+
48+
- Master index: [K06 master index](KNOTS/K06_data-governance-ssot-schemas-identifiers/00_00_IDX_LC01_SPACET_k06-data-governance-ssot-schemas-identifiers_v01.md)
49+
_Comment:_ Authoritative K06 navigation hub across impacted ATAs with closure criteria and NKU controls.
50+
51+
- ATA partitions (high-priority subset):
52+
- [ATA 91 — Schemas & Canonical Models](KNOTS/K06_data-governance-ssot-schemas-identifiers/ATA_TASKS/ATA_91/91_00_IDX_LC01_SPACET_k06-ata-91-tasklist_v01.md)
53+
_Comment:_ Schema registry, versioning, compatibility, canonical primitives.
54+
- [ATA 93 — Traceability Graph & Evidence Links](KNOTS/K06_data-governance-ssot-schemas-identifiers/ATA_TASKS/ATA_93/93_00_IDX_LC01_SPACET_k06-ata-93-tasklist_v01.md)
55+
_Comment:_ Node/edge semantics, evidence freshness, audit-ready snapshots.
56+
- [ATA 94 — DPP](KNOTS/K06_data-governance-ssot-schemas-identifiers/ATA_TASKS/ATA_94/94_00_IDX_LC01_SPACET_k06-ata-94-tasklist_v01.md)
57+
_Comment:_ Export packs, provenance, signing coupling, redaction rules.
58+
- [ATA 95 — SBOM / ModelBOM](KNOTS/K06_data-governance-ssot-schemas-identifiers/ATA_TASKS/ATA_95/95_00_IDX_LC01_SPACET_k06-ata-95-tasklist_v01.md)
59+
_Comment:_ Software/ML supply chain identity, policy gates, trace alignment.
60+
- [ATA 99 — Master Registers](KNOTS/K06_data-governance-ssot-schemas-identifiers/ATA_TASKS/ATA_99/99_00_IDX_LC01_SPACET_k06-ata-99-tasklist_v01.md)
61+
_Comment:_ Namespace boundaries, dedup governance, drift monitoring.
62+
63+
---
64+
65+
### K07 — AI Autonomy Assurance & Monitoring
66+
- Knot folder: [K07_ai-autonomy-assurance-monitoring/](KNOTS/K07_ai-autonomy-assurance-monitoring/)
67+
_Comment:_ Assurance cases, runtime monitoring, autonomy constraints, safe operation envelopes (structure to be populated).
68+
- Entry index (to create/confirm): [K07 index](KNOTS/K07_ai-autonomy-assurance-monitoring/00_00_IDX_LC01_SPACET_k07-ai-autonomy-assurance-monitoring_v01.md)
69+
_Comment:_ Defines the uncertainty, closure criteria, and ATA partitions.
70+
71+
---
72+
73+
### K13 — Cybersecurity Zones & Key Management
74+
- Knot folder: [K13_cybersecurity-zones-key-management/](KNOTS/K13_cybersecurity-zones-key-management/)
75+
_Comment:_ Key management, zone boundaries, cryptographic identity, and CI enforcement coupling with SBOM/DPP.
76+
- Entry index (to create/confirm): [K13 index](KNOTS/K13_cybersecurity-zones-key-management/00_00_IDX_LC01_SPACET_k13-cybersecurity-zones-key-management_v01.md)
77+
_Comment:_ Defines the uncertainty, closure criteria, and ATA partitions.
78+
79+
---
80+
81+
## 4) Operating Model (Decision + Evidence + Baseline)
82+
83+
### 4.1 Partitioned Uncertainty Resolution (NKU)
84+
- NKU credit is granted only when a partition is closed with:
85+
- **Evidence links** (reproducible, stable targets; staleness controlled), and
86+
- **Decision record** (minutes + approvals when required).
87+
- Each knot/ATA tasklist includes a **Control & Monitoring** section describing NKU scoring and thresholds.
88+
89+
### 4.2 TEKNIA Sharing Gate (for publishable increments)
90+
A TEKTOK or shareable knowledge increment must include:
91+
- knot_id, ata, partitions_closed
92+
- referenced schema IDs / registry IDs / trace snapshot IDs
93+
- evidence links + decision reference
94+
- dedup proof (hash + namespace checks)
95+
- NV and sharing classification (internal/external)
96+
97+
### 4.3 Coordination Interfaces
98+
- **CM (Configuration Management):** approves baseline changes, nomenclature compliance, and closure discipline.
99+
- **DATA (Data Governance):** owns SSOT boundaries and stewardship assignments.
100+
- **CY (Cybersecurity):** owns key management, threat-driven constraints, and security evidence packaging.
101+
- **TEST (IVVQ):** owns test evidence nodes, qualification pathways, and trace-verified evidence chains.
102+
103+
---
104+
105+
## 5) Execution Checklist (minimum)
106+
107+
1. Choose the target knot (K06/K07/K13).
108+
2. Open the knot **master index** and select the impacted ATA tasklist.
109+
3. Execute tasks by partitions (IDs/Schema/Exports/CI/Evidence/Decisions/Adoption).
110+
4. Update NKU ledgers and evidence links.
111+
5. Route governance-impacting changes through CM for approval and baseline tagging.
112+
113+
---

0 commit comments

Comments
 (0)