[Foundry branch-to-branch] Add a service contract library target to facilitate ingestion #2781
summarize-impact-test.yaml
on: pull_request
Matrix: summarize-impact / test
Annotations
3 errors
|
summarize-impact / test (ubuntu, 20)
Process completed with exit code 1.
|
|
summarize-impact / test (windows, 24)
The strategy configuration was canceled because "summarize-impact.test.ubuntu_20" failed
|
|
summarize-impact / test (windows, 24)
The operation was canceled.
|