Skip to content

feat: rewrite go-runner to use overlay files #393

feat: rewrite go-runner to use overlay files

feat: rewrite go-runner to use overlay files #393

Triggered via pull request January 12, 2026 18:13
Status Failure
Total duration 1h 10m 35s
Artifacts

ci.yml

on: pull_request
Matrix: compat-integration-test-walltime
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 5 warnings
tests (1.24.x)
Process completed with exit code 100.
tests (1.25.x)
The strategy configuration was canceled because "tests._1_24_x" failed
tests (1.25.x)
The operation was canceled.
compat-integration-test-walltime (example)
The self-hosted runner lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
check
Process completed with exit code 1.
lint
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
compat-integration-test-walltime (example/very/nested/module)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
compat-integration-test-walltime (example/compat)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
compat-integration-test-walltime (example/external)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
compat-integration-test-walltime (example/timing)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2