Skip to content

CI

CI #419

Manually triggered January 26, 2026 10:32
Status Cancelled
Total duration 31s
Artifacts

ci.yml

on: workflow_dispatch
Matrix: compat-integration-test-walltime
Matrix: tests
lint
20s
lint
go-runner-benchmarks
0s
go-runner-benchmarks
Fit to window
Zoom out
Zoom in

Annotations

14 errors
compat-integration-test-walltime (example/compat)
The run was canceled by @not-matthias.
compat-integration-test-walltime (example)
The run was canceled by @not-matthias.
go-runner-benchmarks
The run was canceled by @not-matthias.
compat-integration-test-walltime (example/timing)
The run was canceled by @not-matthias.
compat-integration-test-walltime (example/external)
The run was canceled by @not-matthias.
tests (1.25.x)
The run was canceled by @not-matthias.
tests (1.25.x)
The operation was canceled.
tests (1.24.x)
The run was canceled by @not-matthias.
tests (1.24.x)
The operation was canceled.
lint
The run was canceled by @not-matthias.
lint
The operation was canceled.
check
Process completed with exit code 1.
CI
The run was canceled by @not-matthias.