Skip to content

DSB Maintenance Iteration 15: Agenda & Minutes (3 May 2023)

CDR API Stream edited this page Apr 28, 2023 · 15 revisions

Date and time: 03/05/2023, 2:00pm – 4:00pm AEST

Location: Microsoft Teams Meeting

Dial-in details:

Chair: Brian Kirkpatrick, DSB

Maintenance overview: Further information

Maintenance project board: See here

Decision Proposal: This maintenance iteration is being consulted on under Decision Proposal 303: Maintenance Iteration 15

Housekeeping

Recording

The Maintenance Iteration Calls are recorded for note taking purposes only. All recordings are kept securely, as are the transcripts which may be made from them. No identifying material will be provided without the participant's consent. Participants may email contact@consumerdatastandards.gov.au should they have any further questions or wish to have any material redacted from the record.

Acknowledgement of Country

We acknowledge the Traditional Custodians of the various lands on which we work today and the Aboriginal and Torres Strait Islander people participating in this call.

We pay our respects to Elders past, present and emerging, and recognise and celebrate the diversity of Aboriginal peoples and their ongoing cultures and connections to the lands and waters of Australia.

Agenda

  • Introductions
  • Release plan
  • Open Consultations
  • Future Plan
  • Playback Maintenance Iteration 14 Retrospective
  • Outstanding Actions
  • Maintenance Iteration 15 Candidates
  • Any other business

Meeting notes

Introductions

The purpose of this meeting is to:

  • Play back responses to the Maintenance Iteration 14 Retrospective Survey
  • Groom the backlog to discuss iteration candidates for Maintenance Iteration 15

Release plan

  • Current version of the standards is 1.23.0 published on 14 April 2023, refer to the release notes for details
  • Version 1.24.0 release of the standards, incorporating changes consulted on in Maintenance Iteration 14, is in progress and will be posted on standards staging for review when available.

Open Consultations

The following Consultations are open for community feedback

Consultation Closing date
Decision Proposal 229 - CDR Participant Representation Placeholder: no close date
Link to consultation
Decision Proposal 267 - Telco Data Language TBD
Link to consultation
Noting Paper 276 - Proposed V5 Rules: Standards Impacts TBD
Link to consultation
Decision Proposal 288 - Non-Functional Requirements Revision
‼️
Link to consultation
Noting Paper 289 - Register Standards Revision
Extended to 12 May 2023
Link to consultation
Decision Proposal 302 - Telco Draft Feedback Cycle 2 TBD
Link to consultation

Future Plan

Review of April-June Quarter and new changes: https://github.com/ConsumerDataStandardsAustralia/future-plan/projects/1

Playback Maintenance Iteration 14 Retrospective

The DSB is trialling a new way to gain Retrospective insight for Maintenance Iterations by using a survey.

Jarryd Judd will playback the findings in this session.

Outstanding Actions

NOTE: Where a 💡 appears it indicates the Action will be discussed later in the Agenda under Maintenance Iteration 15 Candidates.

InfoSec

  • DSB to seek legal advice on the enforceability or the binding status of the standards versus an implementation guide with regard to Issue #522 OpenID Provider Configuration End Point parameter requirements.

    • In progress 💡
  • Issue 576 DSB to advise if the following interpretation is correct and to make an announcement in the Implementation Call to make it clear to ADRs.

    • FAPI phase 4: it has been interpreted that existing clients who have already registered with a data holder must update their registration to indicate if they want to receive data in Signed format or Signed+Encrypted format. Is this correct and aligned with the intention of the DSB?
    • Response provided at the Implementation Call on 20/04/2023:
      • Accredited Data Recipients (ADR) are reminded we're entering a three month phase to transition from the hybrid flow to the authorization code flow (ACF). During that time, Data Holders (DH) will be supporting both flows. The intention of this phasing period is for ADRs to test software products using the ACF with a fall back mechanism to hybrid flow. Any issues encountered can be resolved during transition. Once transition is complete the hybrid flow can be deprecated. ADRs are encouraged to test their implementation of ACF by updating client registrations with each DH before the 10th of July when DHs will only support ACF.

‼️ In my mind this question is not answered by Marks update, I think it's yes, but I don't think the difference between Signed or Signed+Encrypted is the difference between Hybrid and ACF?? I've messaged Mark and will update when I've heard back from him. ‼️

Maintenance Iteration 15 Candidates

The items tabled below have been carried over from MI14. The DSB invites participants to propose items for consideration and prioritisation. You can do this by posting a comment on Decision Proposal 303 and attending the meeting on 3 May to provide context and detail on your requirements in support of your request.

Domain # Issue Proposal Status Change Proposed Standards Staging link
MI 15 586 Iteration 15 Holistic Feedback
InfoSec 522 OpenID Provider Configuration End Point parameter requirements Carried over from MI14
Banking 567 BankingProductLendingRateV2 - Lending Rates - FIXED/INTEREST_ONLY period end date cannot be determined Carried over from MI14
Banking 569 Home Loan Revert rate and product is not available Carried over from MI14
Schema 538 Payload conventions; optional fields with null values aren't defined in schemas Carried over from MI14

Other Business

Next Steps

Meeting Minutes

Getting Started

Meetings

Maintenance Iterations

CDR Implementation Call

Clone this wiki locally