Skip to content

fix: use bridge3 in cd #4

fix: use bridge3 in cd

fix: use bridge3 in cd #4

Triggered via push December 16, 2025 06:15
Status Failure
Total duration 1m 18s
Artifacts

tests.yaml

on: push
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

9 errors
integration-memory
Process completed with exit code 1.
integration-postgres
The strategy configuration was canceled because "integration.memory" failed
integration-postgres
The operation was canceled.
integration-nginx
The strategy configuration was canceled because "integration.memory" failed
integration-nginx
The operation was canceled.
integration-cluster-valkey
The strategy configuration was canceled because "integration.memory" failed
integration-cluster-valkey
The operation was canceled.
integration-dnsmasq
The strategy configuration was canceled because "integration.memory" failed
integration-dnsmasq
The operation was canceled.