Skip to content

CORE Production-Readiness: the last mile #799

Description

@DariuszNewecki

The consolidated map from where CORE is now to the Beta → Production/Stable flip (#795). Replaces the scattered .specs/planning/ trackers (now archived) with a single tracked surface.

The stance

Production/Stable is a one-way reputational claim, distinct from the software being ready. CORE's own NorthStar ranks defensibility > productivity — so the bar for the label is higher than the bar for the code. This epic is the disciplined last mile: earn the claim, don't rush it.

Evidence already green (2026-07-14)

The last-mile work

What "green board" means here

Not zero issues — zero open defects. Every issue above is tracked forward-work, not a bug. That honest backlog is a stronger signal to a skeptic than an empty tracker.

Also open (governance-debt, not last-mile blockers)

Tracked here for visibility; not gating #795. Checked off only once actually resolved:


2026-07-16 external review — verified follow-ups

Second external architecture review (against main @ af5d7549; full history, 2,382 commits). Every claim below survived an in-session adversarial verification pass (4 parallel agents + direct AST/grep checks); refuted claims are recorded so nothing masquerades as work. Same flow as the 2026-07-12 review: findings → issues → this epic; no new planning doc.

Last-mile relevant:

Governance-debt tail (joins #788/#790/#793/#794):

Folded, flagged, refuted:

Metadata

Metadata

Labels

roadmapRoadmap itemtype:taskSingle executable unit of work. One session, one outcome. The default for most issues.

Projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions