chore(deps): bump the runtime-minor-and-patch-dependencies group across 1 directory with 2 updates #7626
test-optimization.yml
on: pull_request
Performance and correctness tests
1m 47s
Matrix: integration-cucumber
Matrix: integration-cypress
Matrix: integration-jest
Matrix: integration-mocha
Matrix: integration-playwright
Matrix: integration-selenium
Matrix: integration-vitest
Matrix: integration
Annotations
4 errors
|
Performance and correctness tests
Process completed with exit code 1.
|
|
integration-vitest (oldest)
Process completed with exit code 60.
|
|
integration-vitest (latest)
The strategy configuration was canceled because "integration-vitest.oldest" failed
|
|
integration-vitest (latest)
The operation was canceled.
|