Skip to content

chore(deps): bump the runtime-minor-and-patch-dependencies group across 1 directory with 2 updates #7626

chore(deps): bump the runtime-minor-and-patch-dependencies group across 1 directory with 2 updates

chore(deps): bump the runtime-minor-and-patch-dependencies group across 1 directory with 2 updates #7626

Status Failure
Total duration 15m 51s
Artifacts

test-optimization.yml

on: pull_request
Performance and correctness tests
1m 47s
Performance and correctness tests
Matrix: integration-cucumber
Matrix: integration-cypress
Matrix: integration-jest
Matrix: integration-mocha
Matrix: integration-playwright
Matrix: integration-selenium
Matrix: integration-vitest
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Performance and correctness tests
Process completed with exit code 1.
integration-vitest (oldest)
Process completed with exit code 60.
integration-vitest (latest)
The strategy configuration was canceled because "integration-vitest.oldest" failed
integration-vitest (latest)
The operation was canceled.