Skip to content

build

build #3952

Triggered via schedule January 26, 2026 05:21
Status Failure
Total duration 43m 41s
Artifacts

build.yml

on: schedule
Matrix: pretest
pre-commit
48s
pre-commit
test-dashboard-build
6m 19s
test-dashboard-build
Matrix: backward-compatibility
Matrix: test-long-algos
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (ubuntu-latest, 3.14)
Process completed with exit code 1.
test (ubuntu-latest, 3.13)
The strategy configuration was canceled because "test.ubuntu-latest_3_14" failed
test (ubuntu-latest, 3.13)
The operation was canceled.
test (ubuntu-latest, 3.12)
The strategy configuration was canceled because "test.ubuntu-latest_3_14" failed
test (ubuntu-latest, 3.12)
The operation was canceled.
test (ubuntu-latest, 3.11)
The strategy configuration was canceled because "test.ubuntu-latest_3_14" failed
test (ubuntu-latest, 3.11)
The operation was canceled.