Add comprehensive test suite for CI/CD #2
test.yml
on: pull_request
lint
10s
integration-tests
2m 19s
throughput-tests
8s
test-coverage
4m 32s
Matrix: unit-tests
Annotations
8 errors
|
throughput-tests
Process completed with exit code 1.
|
|
unit-tests (3.11)
Process completed with exit code 1.
|
|
integration-tests
Process completed with exit code 1.
|
|
unit-tests (3.9)
The operation was canceled.
|
|
unit-tests (3.9)
The strategy configuration was canceled because "unit-tests._3_11" failed
|
|
unit-tests (3.10)
The operation was canceled.
|
|
unit-tests (3.10)
The strategy configuration was canceled because "unit-tests._3_11" failed
|
|
test-coverage
Process completed with exit code 1.
|