chore: Upgrade eslint to v9 #10922
tests.yml
on: pull_request
Verify changes
16s
Backend tests
9m 32s
Postgres tests
9m 32s
UI unit tests
3m 3s
UI OS tests
9m 35s
UI EE tests
9m 35s
Notify on failure
0s
Annotations
10 errors
|
Backend tests
Canceling since a higher priority waiting request for Tests-refs/pull/7760/merge exists
|
|
Backend tests
The operation was canceled.
|
|
Postgres tests
Canceling since a higher priority waiting request for Tests-refs/pull/7760/merge exists
|
|
Postgres tests
The operation was canceled.
|
|
UI OS tests
Canceling since a higher priority waiting request for Tests-refs/pull/7760/merge exists
|
|
UI OS tests
The operation was canceled.
|
|
UI EE tests
Canceling since a higher priority waiting request for Tests-refs/pull/7760/merge exists
|
|
UI EE tests
The operation was canceled.
|
|
Tests summary
Process completed with exit code 1.
|
|
Tests
Canceling since a higher priority waiting request for Tests-refs/pull/7760/merge exists
|