Skip to content

ESLint migration followups #10939

ESLint migration followups

ESLint migration followups #10939

Triggered via pull request July 8, 2026 10:45
Status Cancelled
Total duration 10m 14s
Artifacts

tests.yml

on: pull_request
Verify changes
11s
Verify changes
Check TypeScript drift
1m 38s
Check TypeScript drift
Tests summary
2s
Tests summary
Notify on failure
Notify on failure
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Postgres tests
Canceling since a higher priority waiting request for Tests-refs/pull/7774/merge exists
Postgres tests
The operation was canceled.
Backend tests
Canceling since a higher priority waiting request for Tests-refs/pull/7774/merge exists
Backend tests
The operation was canceled.
UI OS tests
Canceling since a higher priority waiting request for Tests-refs/pull/7774/merge exists
UI OS tests
The operation was canceled.
UI EE tests
Canceling since a higher priority waiting request for Tests-refs/pull/7774/merge exists
UI EE tests
The operation was canceled.
Tests summary
Process completed with exit code 1.
Tests
Canceling since a higher priority waiting request for Tests-refs/pull/7774/merge exists