For a ppp solution, added an ERP file to the config file under inputs: erp_files: and with estimation_parameters: global_models: eop: disabled then the ERP data was not used.
There is a test in erp.cpp getErp() if (recOpts.eop == false) return erpv; which appeared to be causing the code to give up on the search. If this test was disabled then it to proceed to find and use the ERP data.
In ppp_obs.cpp receiverUducGnss() if (recOpts.eop) pppEopAdjustment(COMMON_PPP_ARGS); this same flag appears to be used enable estimation.
Should it be possible to use an ERP product without estimation enabled, and is there a way to do so?