Hello,
Are the loads in REAL_TIME_regional_Load.csv supposed to work with the grid network specified in RTS_GMLC.m?
I was trying to solve an ACOPF with a grid network from RTS_GMLC.m and load from REAL_TIME_regional_Load.csv. However, I found that the sum of the lower bounds of active power of generators in RTS_GMLC.m could be greater than the sum of area loads, resulting in infeasibility. For example, the sum of the lower bounds of active power (i.e., the sum of Pmin of generators with status being 1) in RTS_GMLC.m is 3744.99 MW, but the sum of area loads of the first time period is 3289.53 MW. In this case, no feasible active powers can be found.
I wonder if this is correct.