The research investigates restructuring specific Linux kernel components from C to Rust to mitigate memory security vulnerabilities. The project selected the r8169 network driver (Realtek RTL8111/8168/8411 PCI Express Gigabit Ethernet Controller) as the target component for this proof-of-concept (POC) implementation.

Sprint 1: Project Definition

Duration: August 4-15, 2025

The initial sprint established the foundational framework for the research. Key deliverables included preparing the Technical Approach and Project Implementation (TAPI) form and defining the project's macro scope. The scope formalized the research question: "How can the restructuring of specific Linux kernel components from C to Rust effectively mitigate memory security vulnerabilities?"

The project scope was defined to focus on a single, limited Linux kernel component with criteria including functional relevance, known memory security vulnerabilities in the C implementation, and manageable complexity for migration within available resources.

Sprint 2: Exploratory Analysis

Duration: August 18-29, 2025

This sprint focused on comprehensive research and component selection. The team produced three critical research reports: definition and description of the analyzed component, research on Linux driver development, and research on software engineering using Rust.

The r8169 driver was selected based on its widespread use in consumer hardware, well-documented codebase, and known memory management patterns typical of network drivers that could benefit from Rust's safety guarantees. Network drivers represent a particularly vulnerable attack surface due to their exposure to untrusted network inputs.

Sprint 3: Deepening the Research

Duration: September 1-12, 2025

The third sprint delivered substantial theoretical groundwork. Major deliverables included a complete literature review on memory security in C and Rust within the kernel context, detailed analysis of the involved hardware and firmware developed in C, and definition of the restructuring methodology.

The methodology documentation detailed strategies for gradual and secure migration, including tools and techniques such as static analysis with Clippy for Rust, dynamic analysis capabilities, and interoperability approaches between C and Rust modules within the kernel environment.

Sprint 4: Implementation Phase 1/8

Duration: September 15-26, 2025

Implementation began with architectural planning and environment setup. The sprint produced Rust design proposal documentation detailing the component's architecture and design, including interfaces for interoperability with C.

The development environment construction involved physical components and virtualization infrastructure, establishing the necessary toolchain including the Rust compiler (rustc), Cargo package manager, and kernel compilation tools such as GCC, Clang, and Make. This setup enabled compilation of Rust modules within the Linux kernel build system, a critical technical milestone.

Sprint 5: Implementation Phase 2/8

Duration: September 29 - October 10, 2025

The fifth sprint transitioned from planning to active code development. Key deliverables included construction of basic component modules in Rust and elaboration of initial tests.

The r8169_rs repository contains the initial Rust implementation of core driver functionality. The linuxdrivers repository provides the development environment framework supporting the implementation process. Initial modules implemented fundamental driver operations while maintaining compatibility with the existing kernel infrastructure through carefully designed Foreign Function Interface (FFI) bindings.

Sprint 6: Implementation Phase 3/8

Duration: October 13-24, 2025

Efforts focused on extracting and reimplementing security-critical subsystems in Rust. Particular attention was given to the firmware handling logic in the original C driver—a complex and historically vulnerable section involving binary blob parsing, checksum validation, and register programming.

A major refactoring resulted in a modular Rust firmware subsystem featuring safe parsing through bounds-checked operations, explicit error handling, and macro-generated enums for opcodes and chip versions. New source files (firmware.rs, macros.rs) were introduced, eliminating scattered hardcoded data from the prior monolithic structure.

Patterns derived from the public rustsp_oct25_demos repository were adopted to ensure idiomatic and safe Rust kernel code, including minimized unsafe blocks and robust casting helpers. The sprint concluded with successful compilation of a hybrid module integrating the new Rust firmware components with the unmodified C driver core.

Sprint 7: Implementation Phase 4/8

Duration: October 27 - November 7, 2025

The firmware handling logic was fully decoupled into an independent, reusable Rust crate named r8169_firmware. All related functionality was migrated to a dedicated directory structure.

The module was redesigned to expose a stable C-callable ABI through a custom procedural macro (define_rtl_c_fn!) that generated #[no_mangle] extern "C" wrappers. Closure-based designs were replaced with function-pointer callbacks for complete FFI compatibility, while explicit resource management using Option<T> and dedicated release functions ensured correctness in no-alloc kernel contexts.

Build verification demonstrated seamless integration: the modified original r8169.c successfully linked against the Rust firmware module, yielding a functional hybrid r8169.ko with all required rtl_fw_* symbols correctly exported on x86_64 and aarch64 architectures.

Sprint 8: Implementation Phase 5/8

Duration: November 10-21, 2025

Further refinement of the Rust firmware subsystem emphasized enhanced safety and maintainability. Improvements included stricter bounds checking based on parsed action sizes, consistent error propagation using POSIX codes, and device-aware logging via kernel macros.

The primary driver codebase was streamlined by removing redundant firmware logic from the C portion, resulting in a more focused core responsible solely for PCI probing, interrupt management, and MAC/PHY operations. Independent compilation of the firmware crate was validated, facilitating parallel development.

Sprint 9: Implementation Phase 6/8

Duration: November 24 - December 5, 2025

Functional validation of the refactored hybrid driver was prioritized. Extensive QEMU-based testing in a minimal Debian environment successfully exercised the complete firmware request → parse → write sequence within the Rust subsystem.

Detailed dmesg traces verified proper header validation, checksum computation, and action iteration through FFI callbacks.

Initial bare-metal deployment attempts revealed environment-specific challenges but provided indirect confirmation of build integrity. The Rust firmware module introduced no additional instability while delivering measurable improvements in memory safety compared to the original C implementation.

Sprint 10: Implementation Phase 7/8

Duration: December 8-19, 2025

Enhanced tracing mechanisms have been implemented to capture Rust firmware execution paths upon successful probing. Planning advances for porting the r8169_firmware module to the related r8169 driver, demonstrating cross-family reusability.

Sprint 11: Contingency Activation - Plan B Pivot

Duration: February 9-20, 2026

r8169 hybrid bare-metal probe-time panics persisted despite workarounds (r8169.aspm=0, pcie_aspm=off). Activated Plan B per contingency milestone: pivoted to upstream nullblk.c vs rnull.rs comparison, eliminating hardware variables.

Archived r8169 firmware crate as integration case study. Built parallel Linux 6.18.y kernels (Kernel A: CONFIG_NULL_BLK=y; Kernel B: CONFIG_RUST=y, CONFIG_RNULL=m) with KASAN.

Sprint 12: Environment Setup & Static Analysis

Duration: February 23 - March 6, 2026

Verified both kernels boot cleanly on QEMU/bare-metal. modprobe nullblk/rnull created /dev/nullb* devices correctly. Static analysis: nullblk.c (1,450 LoC, 41% safety fixes historically); rnull.rs (1,100-1,300 LoC, 0 unsafe in core).

Initial fio smoke tests (4k bs, QD=8) comparable IOPS. Generated CSV metrics (LoC, unsafe density).

Sprint 13: fio Benchmark Matrix

Duration: March 9-20, 2026

Executed fio matrix (216 configs, 50 runs/driver): rnull 25-30% IOPS deficit vs nullblk (peaks 4k randrw, shrinks 1M seq). Queue-depth invariant (falsifies H3). Tail latencies nullblk p95/99 lower by 3-15μs.

KASAN stress (200 device cycles + fio) clean. Automated QEMU tooling with idempotent testing.

Sprint 14: Infrastructure Hardening

Duration: March 6-19, 2026

Hardened test env for syzkaller: SSH-dropbear (replaces telnet), guest networking (10.0.2.15/24), BusyBox PKGBUILD, syzkaller Docker build. Hypothesis status: H2/H3 falsified (25-30% overhead constant); H1 pending.

Sprint slippage: infrastructure focus deferred fuzzing/static analysis.

Sprint 15: Initial Syzkaller & Synthesis

Duration: March 20 - April 10, 2026

Executed syzkaller campaigns: no block-driver bugs (crashes scheduler/RPC noise only)—H1 inconclusive. Synthesized: Rust imposes 25% perf cost, no observed dynamic safety gain in mature drivers.

Next: extend fuzzing (48-72h), static/commit mining.

Sprint 16: Static Analysis & Evidence-Gated Pipeline Design

Duration: April 13-24, 2026

Completed the deferred static and commit-history analysis. The null_blk.c commit log (2020–2025) was mined and CWE-classified: 69 of 106 commits carry a safety signal (65%), mapped against the ACSAC R4L taxonomy (auto-eliminated / needs-discipline / language-unaffected). rnull.rs confirmed zero unsafe blocks in core driver logic, with all unsafe confined to C API wrappers.

The evidence-gated pipeline was designed: a three-gate framework (safety, fuzzing, performance) plus a Phase 1 candidate screening step that scores drivers across four lenses (historical risk, static unsafe surface, dynamic robustness, tractability). Pipeline scripts were written and integrated with the nullb automation toolchain, decoupling performance preparation from benchmark execution.

Sprint 17: Extended Fuzzing & Paper Planning

Duration: April 27 - May 8, 2026

Executed ten 24-hour syzkaller campaigns per driver with crash attribution filtering to isolate target-attributable failures from SSH/RPC harness noise. Result: Mann-Whitney U p=0.37, Vargha-Delaney A₁₂=0.45—no block-driver regression attributable to rnull (fuzzing gate passes under do-no-harm framing). Monte Carlo power simulation added to verify that the campaign length was adequate for detecting large effects.

Final performance results locked: all 18 matched fio cells regress for rnull (median −14.4%, worst −25.5%), with every cell surviving Holm correction. The paper plan was drafted, establishing the research contribution as the pipeline structure rather than a simple pass/fail verdict on rnull.

Sprint 18: Results Synthesis & Research Paper Draft

Duration: May 11-22, 2026

Synthesized the full evidence profile for the null_blk/rnull pair: safety gate did not pass (elimination rate 18.18% < 34.2% threshold, driven by CWE-362-family races and logic errors outside Rust's scope); fuzzing gate passed; performance gate did not pass. The three-gate disagreement was framed as the primary scientific contribution—the signal an R4L upstreaming discussion should want.

Drafted the research paper targeting an academic venue. Figures generated reproducibly from canonical result artifacts; numeric claims verified by automated script.

Sprint 19: Paper Finalization & Submission

Duration: May 25 - June 5, 2026

Iterated through final paper revisions: double-blind anonymization, rewording toward storage-systems framing, RFC-status clarification for rnull, and PDF metadata stripping. All five pages of the camera-ready submission verified against the formatting checklist.

Research paper finalized. The pipeline, result artifacts (safety.json, fuzz_stats.json, perf_stats.json, verdict.json, perf.csv, fuzz.csv), and reproducible build environment (Nix flake + LaTeX Makefile) constitute the final research deliverable.

Sprint 20: Final Presentation & Project Closure

Duration: June 8-19, 2026

Final academic deliverables and project retrospective.