Skip to content

Run Imp conformance tests at the epoch boundary #19474

Run Imp conformance tests at the epoch boundary

Run Imp conformance tests at the epoch boundary #19474

Triggered via pull request August 15, 2025 09:47
Status Cancelled
Total duration 8m 40s
Artifacts

haskell.yml

on: pull_request
Matrix: build
fourmolu
40s
fourmolu
shellcheck
5s
shellcheck
cabal-format
6s
cabal-format
gen-hie
7m 10s
gen-hie
Check branch history
12s
Check branch history
Check if formal-ledger-specifications SRP is valid
19s
Check if formal-ledger-specifications SRP is valid
Check that there are no additions of `undefined`s in the PR diff
14s
Check that there are no additions of `undefined`s in the PR diff
Matrix: test
codegen
codegen
Tests completed
3s
Tests completed
Send a slack notification on \#ledger-internal if the nightly build failed
0s
Send a slack notification on \#ledger-internal if the nightly build failed
Fit to window
Zoom out
Zoom in

Annotations

12 errors
cabal-format
Process completed with exit code 1.
Check that there are no additions of `undefined`s in the PR diff
Process completed with exit code 1.
build (9.10.2, ubuntu-latest)
The operation was canceled.
build (9.10.2, ubuntu-latest)
Canceling since a higher priority waiting request for Haskell CI-5221 exists
build (9.6.7, ubuntu-latest)
The operation was canceled.
build (9.6.7, ubuntu-latest)
Canceling since a higher priority waiting request for Haskell CI-5221 exists
build (9.8.4, ubuntu-latest)
The operation was canceled.
build (9.8.4, ubuntu-latest)
Canceling since a higher priority waiting request for Haskell CI-5221 exists
build (9.12.2, ubuntu-latest)
The operation was canceled.
build (9.12.2, ubuntu-latest)
Canceling since a higher priority waiting request for Haskell CI-5221 exists
Haskell CI
Canceling since a higher priority waiting request for Haskell CI-5221 exists
Tests completed
Process completed with exit code 1.