Skip to content

chore(rust): update to 1.92 #504

chore(rust): update to 1.92

chore(rust): update to 1.92 #504

Triggered via push December 27, 2025 21:32
Status Failure
Total duration 1m 10s
Artifacts

ci.yaml

on: push
Build matrix
6s
Build matrix
Matrix: lint-and-test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Lint and test (linux-arm64-musl)
Process completed with exit code 101.
Lint and test (linux-x64-musl)
The strategy configuration was canceled because "lint-and-test.linux-arm64-musl_ubuntu-2" failed
Lint and test (linux-x64-musl)
Process completed with exit code 101.
Lint and test (linux-x64-glibc)
The strategy configuration was canceled because "lint-and-test.linux-arm64-musl_ubuntu-2" failed
Lint and test (linux-x64-glibc)
The operation was canceled.
Lint and test (linux-arm64-glibc)
The strategy configuration was canceled because "lint-and-test.linux-arm64-musl_ubuntu-2" failed
Lint and test (linux-arm64-glibc)
The operation was canceled.
Lint and test (win32-x64-msvc)
The strategy configuration was canceled because "lint-and-test.linux-arm64-musl_ubuntu-2" failed
Lint and test (win32-x64-msvc)
The operation was canceled.
Lint and test (win32-arm64-msvc)
The strategy configuration was canceled because "lint-and-test.linux-arm64-musl_ubuntu-2" failed
Lint and test (win32-arm64-msvc)
The operation was canceled.
Lint and test (darwin-arm64)
The strategy configuration was canceled because "lint-and-test.linux-arm64-musl_ubuntu-2" failed
Lint and test (darwin-arm64)
The operation was canceled.
Lint and test (darwin-x64)
The strategy configuration was canceled because "lint-and-test.linux-arm64-musl_ubuntu-2" failed
Lint and test (darwin-x64)
The operation was canceled.