Skip to content

Bump actions/checkout from 4 to 6 #4

Bump actions/checkout from 4 to 6

Bump actions/checkout from 4 to 6 #4

Triggered via push November 24, 2025 19:48
Status Failure
Total duration 32s
Artifacts

run-tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

29 errors
P8.3 - L11.* - prefer-lowest - ubuntu-latest
Process completed with exit code 2.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.2 - L10.* - prefer-lowest - ubuntu-latest
Process completed with exit code 2.
P8.3 - L11.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.3 - L11.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.2 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.3 - L10.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.3 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.3 - L10.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.3 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.3 - L11.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.3 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.3 - L10.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.3 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.3 - L11.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.3 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.2 - L11.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.2 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.2 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.3 - L10.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.3 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.2 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11___pr" failed
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.