Skip to content

Latest commit

 

History

History
51 lines (39 loc) · 2.38 KB

README.md

File metadata and controls

51 lines (39 loc) · 2.38 KB

Pipeline Plan Index

Detailed roadmap plans for each stage of the rat behavioral analysis pipeline.


Stage Overview

flowchart TD
    S1["Stage 01\nVideo Preprocessing"] --> S2["Stage 02\nDeepLabCut\n(ResNet50)"]
    S2 --> S2B["Stage 02B\nDavranış Sınıflandırma\nRearing / Grooming"]
    S2B --> S3A["Stage 03A\nOFT Analizi\n(Davranış Dahil)"]
    S2B --> S3B["Stage 03B\nT-Maze Heatmap'ler\n(Davranış Dahil)"]
    S3A --> S5["Stage 05\nFeature Engineering"]
    S3B --> S4["Stage 04\nRota Analizi\n(Davranış-Deneme)"]
    S4 --> S5
    S5 --> S6["Stage 06\nModel Eğitimi\n(4 Grup)"]
    S6 --> S7["Stage 07\nRaporlama"]
Loading

Gruplar: Kontrol · ASP · Greyfurt · ASP & Greyfurt


Plan Files

Stage Dosya Durum Açıklama
01 STAGE_01_VIDEO_PREPROCESSING.md Not started Video envanteri, metadata CSV, kalite kontrolü
02 STAGE_02_DEEPLABCUT.md Not started DLC proje kurulumu, etiketleme, eğitim, çıkarım
02B STAGE_02B_BEHAVIOR_CLASSIFICATION.md Not started Rearing/grooming tespiti, ethogram, heatmap katmanları
03A STAGE_03A_OFT_ANALYSIS.md Not started OFT metrikleri + davranış bout istatistikleri (4 grup)
03B STAGE_03B_TMAZE_HEATMAPS.md Not started T-maze occupancy + rearing/grooming heatmap'leri
04 STAGE_04_PATH_ANALYSIS.md Not started Dönüş yanlılığı, rota verimliliği, davranış-deneme entegrasyonu
05 STAGE_05_FEATURE_ENGINEERING.md Not started OFT + T-maze + Davranış özelliklerini birleştir, 4 grup etiketi
06 STAGE_06_MODEL_TRAINING.md Not started ML eğitimi, LORO-CV, SHAP değerlendirmesi (4-sınıflı)
07 STAGE_07_REPORTING.md Not started Davranışsal profiller, ethogram galerisi, tez görselleri

How to Update Status

Edit the Status field in each plan file header and in the table above:

Status Meaning
Not started Prerequisites not yet met
In progress Actively being worked on
Blocked Waiting on output from a previous stage
Complete All acceptance criteria met