[pull] master from ghostunnel:master #262
test.yml
on: pull_request
Matrix: Tests (PKCS#11/SoftHSM)
Matrix: Tests
Annotations
8 errors and 1 notice
|
Tests (1.26.x, ubuntu-24.04)
Process completed with exit code 1.
|
|
Tests (1.26.x, ubuntu-22.04)
The strategy configuration was canceled because "test._1_26_x_ubuntu-24_04" failed
|
|
Tests (1.26.x, ubuntu-22.04)
The operation was canceled.
|
|
Tests (1.26.x, windows-latest)
The strategy configuration was canceled because "test._1_26_x_ubuntu-24_04" failed
|
|
Tests (1.26.x, windows-latest)
The operation was canceled.
|
|
Tests (1.26.x, macos-latest)
The strategy configuration was canceled because "test._1_26_x_ubuntu-24_04" failed
|
|
Tests (1.26.x, macos-latest)
The operation was canceled.
|
|
Tests (PKCS#11/SoftHSM) (1.26, ubuntu-24.04)
Process completed with exit code 1.
|
|
Tests (1.26.x, windows-latest)
NOTICE: windows-2025 requests are being redirected to windows-2025-vs2026 by May 12, 2026
|