Skip to content

upgrade deps and housekeeping #10

upgrade deps and housekeeping

upgrade deps and housekeeping #10

Triggered via pull request August 21, 2025 20:28
Status Failure
Total duration 52s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (18, 7.0)
Process completed with exit code 1.
test (18, 6.0)
Process completed with exit code 1.
test (18, 6.0)
The strategy configuration was canceled because "test._18_7_0" failed
test (20, 6.0)
The operation was canceled.
test (20, 6.0)
The strategy configuration was canceled because "test._18_7_0" failed
test (20, 7.0)
The operation was canceled.
test (20, 7.0)
The strategy configuration was canceled because "test._18_7_0" failed
test (22, 6.0)
The operation was canceled.
test (22, 6.0)
The strategy configuration was canceled because "test._18_7_0" failed