release: 50.0.0 #1661
main.yml
on: pull_request
Matrix: Build, lint, and test / Prepare
Check workflows
4s
Matrix: Build, lint, and test / Build
Matrix: Build, lint, and test / Lint
Matrix: Build, lint, and test / Test
Matrix: Build, lint, and test / Validate changelog
Determine whether this is a release merge commit
0s
Publish release
/
publish-npm
Annotations
4 errors
|
Build, lint, and test / Validate changelog (20.x, @metamask/eth-ledger-bridge-keyring)
Process completed with exit code 1.
|
|
Build, lint, and test / Validate changelog (20.x, @metamask/keyring-snap-sdk)
The strategy configuration was canceled because "build-lint-test.validate-changelog._20_x__metamask_eth-ledge" failed
|
|
Build, lint, and test / Validate changelog (20.x, @metamask/keyring-snap-client)
The strategy configuration was canceled because "build-lint-test.validate-changelog._20_x__metamask_eth-ledge" failed
|
|
All jobs pass
Process completed with exit code 1.
|