feat(assets-controller): Unified AssetsController #30962
main.yml
on: pull_request
Check if pull request can skip merge queue
5s
Matrix: Lint, build, and test / Prepare
Matrix: Lint, build, and test / Build
Matrix: Lint, build, and test / Lint
Matrix: Lint, build, and test / Test Scripts
Matrix: Lint, build, and test / Test
Matrix: Lint, build, and test / Validate changelog
Matrix: Analyse code / CodeQL analysis
All jobs pass
4s
Create update issues
/
create-update-issues
Annotations
8 errors
|
Lint, build, and test / Prepare (22.x)
Process completed with exit code 1.
|
|
Lint, build, and test / Prepare (22.x)
Command failed after 5 attempts.
|
|
Lint, build, and test / Prepare (20.x)
The strategy configuration was canceled because "lint-build-test.prepare._22_x" failed
|
|
Lint, build, and test / Prepare (20.x)
The operation was canceled.
|
|
Lint, build, and test / Prepare (20.x)
Command failed after 5 attempts.
|
|
Lint, build, and test / Prepare (18.x)
The strategy configuration was canceled because "lint-build-test.prepare._22_x" failed
|
|
Lint, build, and test / Prepare (18.x)
The operation was canceled.
|
|
All jobs pass
Process completed with exit code 1.
|