chore(deps): update all deps with peer deps #407
check.yml
on: push
Ensure package version match
Matrix: Build & Lint & Test
Annotations
5 errors
|
Build & Lint & Test (25.x)
Process completed with exit code 1.
|
|
Build & Lint & Test (24.x)
The strategy configuration was canceled because "check._25_x" failed
|
|
Build & Lint & Test (24.x)
Process completed with exit code 1.
|
|
Build & Lint & Test (22.x)
The strategy configuration was canceled because "check._25_x" failed
|
|
Build & Lint & Test (22.x)
The operation was canceled.
|