Skip to content

Update .pre-commit-config.yaml #2502

Update .pre-commit-config.yaml

Update .pre-commit-config.yaml #2502

Triggered via pull request July 20, 2026 19:39
Status Cancelled
Total duration 1m 27s
Artifacts

ci.yml

on: pull_request
Matrix: test-local-backend
test-compose
50s
test-compose
test-local-frontend
25s
test-local-frontend
smoke-production
46s
smoke-production
deploy-pr
0s
deploy-pr
build  /  build
build / build
deploy
deploy
notifyMattermost
notifyMattermost
Fit to window
Zoom out
Zoom in

Annotations

12 errors
security
Canceling since a higher priority waiting request for continuous-integration-refs/pull/789/merge exists
security
The operation was canceled.
build-pr / build
Canceling since a higher priority waiting request for continuous-integration-refs/pull/789/merge exists
build-pr / build
The operation was canceled.
test-local-backend (3.12)
Canceling since a higher priority waiting request for continuous-integration-refs/pull/789/merge exists
test-local-backend (3.12)
The operation was canceled.
test-compose
Canceling since a higher priority waiting request for continuous-integration-refs/pull/789/merge exists
test-compose
The operation was canceled.
smoke-production
Canceling since a higher priority waiting request for continuous-integration-refs/pull/789/merge exists
smoke-production
The operation was canceled.
continuous-integration
Canceling since a higher priority waiting request for continuous-integration-refs/pull/789/merge exists
continuous-integration
Canceling since a higher priority waiting request for continuous-integration-refs/pull/789/merge exists