Skip to content

ci: delete merged branches and cancel their in-flight runs #605

ci: delete merged branches and cancel their in-flight runs

ci: delete merged branches and cancel their in-flight runs #605

Triggered via push August 19, 2026 20:31
Status Cancelled
Total duration 14m 37s
Artifacts

ci.yaml

on: push
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
build-e2e-image
Canceling since a higher priority waiting request for CI-refs/heads/jazzy exists
build-e2e-image
The operation was canceled.
sim
Canceling since a higher priority waiting request for CI-refs/heads/jazzy exists
sim
The operation was canceled.
CI
Canceling since a higher priority waiting request for CI-refs/heads/jazzy exists
build-workspace
Node.js 20 is deprecated. The following actions target Node.js 20 but are being forced to run on Node.js 24: actions/cache@v4, actions/github-script@60a0d83039c74a4aee543508d2ffcb1c3799cdea. For more information see: https://github.blog/changelog/2025-09-19-deprecation-of-node-20-on-github-actions-runners/
build-workspace
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2