Describe the bug
In the Fuel Cell-PV-Battery model, the variable production cost in $/kWh is input for batteries (om_production1) and fuel cell (om_production2). These values do not appear to be multiplied by the production anywhere in the financial models before being applied in the financial metric calculations. For example in cmod_singleowner.cpp:
Initialization:

PV production costs are calculated, but not for battery or fuel cell:

Included in operating expenses without any adjustments:

Expected behavior:
Production costs should be adjusted by multiplying by CF_energy_net or CF_energy_net_without_battery for matching units ($ rather than $/kWh).