To use this module you need to:
- Go to Timesheets and open or create a timesheet line (or the Timesheets tab of a project task).
- Fill in the Begin Hour and End Hour.
- Fill in the Break duration.
- The Duration (worked hours) is automatically recomputed as the difference between end and begin hours, minus the break.
The line is validated so that the duration always equals
End Hour - Begin Hour - Break, that the begin hour precedes the end hour, and
that lines do not overlap for the same employee on the same day.