Describe the bug
I am using the weishaupt_modbus integration for the Weishaupt WAB 14.
As the second heat generator (2nd WEZ), an electric heater with three stages is installed in the flow line.
In Home Assistant, the values for the 2nd WEZ are not assigned correctly, and some values are missing.
Expected behavior
In the Weishaupt Modbus documentation, additional data points are listed, and it might be possible to include these as well.
Screenshots



Desktop (please complete the following information):
Additional context
Add any other context about the problem here.
Describe the bug
I am using the weishaupt_modbus integration for the Weishaupt WAB 14.
As the second heat generator (2nd WEZ), an electric heater with three stages is installed in the flow line.
In Home Assistant, the values for the 2nd WEZ are not assigned correctly, and some values are missing.
Expected behavior
In the Weishaupt Modbus documentation, additional data points are listed, and it might be possible to include these as well.
Screenshots
Desktop (please complete the following information):
Additional context
Add any other context about the problem here.