Skip to content

Network solution problem #5

Open
@ekoker

Description

@ekoker

Hi,
I am using EPANET version 2.00.12 and 64 bit version of epanet.dll. I run the test.m file excluding the plot and input modification parts but it doesn't give the same results with solving the system with EPANET for example Network "Net1_Rossman2000" and "Net3_Rossman2000". The results comes same for network 2 but I can't understand why other ones don't. When I run the Test.m file for "Net1_Rossman2000" actual demand values for reservoir and tank are found to be different with the code and EPANET. Also pump operation times and heads are different. The system solves the network for 1 hr intervals however there are additional three mid-interval results. I thought it might be resulting from the controls of the system but when I erase the controls from the input file and solve with the EPANET still I did't get the same answers. Can you help me.
Thank you.
Ezgi KOKER

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions