Skip to content

Updated Upstream (BungeeCord) #296

Updated Upstream (BungeeCord)

Updated Upstream (BungeeCord) #296

Triggered via push September 30, 2025 14:12
Status Failure
Total duration 24s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (8)
Process completed with exit code 1.
build (11)
The operation was canceled.
build (11)
The strategy configuration was canceled because "build._8" failed
build (17)
The operation was canceled.
build (17)
The strategy configuration was canceled because "build._8" failed
build (21)
The operation was canceled.
build (21)
The strategy configuration was canceled because "build._8" failed