Open
Description
Plotting inflow
from build_hydro
reveals unrealistic peaks for MD
. A similar peak is also present for DE
, other countries were not investigated. The peaks in both cases exceed what is possible with existing hydro capacities (DE: factor 2 ca. 4.5 GW installed, MD: factor 5-10, ca. 50 MW installed)
Since these are only temporary peaks they probably don't affect the results too much, also because they are relatively low.
Ideas how to handle:
- Change how the inflow is normalised, e.g. using in addition to the annual generation also the maximum installed capacity per country
- Improve the quality of the inflow dataset
- ?