Skip to content

Commit 39d84ae

Browse files
committed
fix python version below 3.12
1 parent ab6b487 commit 39d84ae

9 files changed

+16
-14
lines changed

environment.yaml

+2-2
Original file line numberDiff line numberDiff line change
@@ -3,15 +3,15 @@ channels:
33
- conda-forge
44
- bioconda
55
dependencies:
6-
- python>=3.9
6+
- python>=3.9,<3.11
77
- pip
88
- snakemake-minimal
99
- pandas>=1.1.0
1010
- numpy
1111
- beautifulsoup4
1212
- xlrd
1313
- scipy
14-
- openpyxl<=3.0.9
14+
- openpyxl<=3.1.0
1515
- packaging
1616

1717
- pip:

outputs/costs_2020.csv

+1-1
Original file line numberDiff line numberDiff line change
@@ -1,4 +1,4 @@
1-
,,value,unit,source,further description,currency_year
1+
technology,parameter,value,unit,source,further description,currency_year
22
Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0
33
Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,
44
Ammonia cracker,investment,1172652.7667,EUR/MW_H2,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 6.","Calculated. For a small (200 t_NH3/d input) facility. Base cost for facility: 51 MEUR at capacity 20 000m^3_NH3/h = 339 t_NH3/d input. Cost scaling exponent 0.67. Ammonia density 0.7069 kg/m^3. Conversion efficiency of cracker: 0.685. Ammonia LHV: 5.167 MWh/t_NH3.; and

outputs/costs_2025.csv

+1-1
Original file line numberDiff line numberDiff line change
@@ -1,4 +1,4 @@
1-
,,value,unit,source,further description,currency_year
1+
technology,parameter,value,unit,source,further description,currency_year
22
Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0
33
Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,
44
Ammonia cracker,investment,1172652.7667,EUR/MW_H2,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 6.","Calculated. For a small (200 t_NH3/d input) facility. Base cost for facility: 51 MEUR at capacity 20 000m^3_NH3/h = 339 t_NH3/d input. Cost scaling exponent 0.67. Ammonia density 0.7069 kg/m^3. Conversion efficiency of cracker: 0.685. Ammonia LHV: 5.167 MWh/t_NH3.; and

outputs/costs_2030.csv

+1-1
Original file line numberDiff line numberDiff line change
@@ -1,4 +1,4 @@
1-
,,value,unit,source,further description,currency_year
1+
technology,parameter,value,unit,source,further description,currency_year
22
Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0
33
Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,
44
Ammonia cracker,investment,1172652.7667,EUR/MW_H2,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 6.","Calculated. For a small (200 t_NH3/d input) facility. Base cost for facility: 51 MEUR at capacity 20 000m^3_NH3/h = 339 t_NH3/d input. Cost scaling exponent 0.67. Ammonia density 0.7069 kg/m^3. Conversion efficiency of cracker: 0.685. Ammonia LHV: 5.167 MWh/t_NH3.; and

outputs/costs_2035.csv

+1-1
Original file line numberDiff line numberDiff line change
@@ -1,4 +1,4 @@
1-
,,value,unit,source,further description,currency_year
1+
technology,parameter,value,unit,source,further description,currency_year
22
Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0
33
Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,
44
Ammonia cracker,investment,1025115.6855,EUR/MW_H2,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 6.","Calculated. For a small (200 t_NH3/d input) facility. Base cost for facility: 51 MEUR at capacity 20 000m^3_NH3/h = 339 t_NH3/d input. Cost scaling exponent 0.67. Ammonia density 0.7069 kg/m^3. Conversion efficiency of cracker: 0.685. Ammonia LHV: 5.167 MWh/t_NH3.; and

outputs/costs_2040.csv

+1-1
Original file line numberDiff line numberDiff line change
@@ -1,4 +1,4 @@
1-
,,value,unit,source,further description,currency_year
1+
technology,parameter,value,unit,source,further description,currency_year
22
Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0
33
Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,
44
Ammonia cracker,investment,877578.6043,EUR/MW_H2,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 6.","Calculated. For a small (200 t_NH3/d input) facility. Base cost for facility: 51 MEUR at capacity 20 000m^3_NH3/h = 339 t_NH3/d input. Cost scaling exponent 0.67. Ammonia density 0.7069 kg/m^3. Conversion efficiency of cracker: 0.685. Ammonia LHV: 5.167 MWh/t_NH3.; and

outputs/costs_2045.csv

+1-1
Original file line numberDiff line numberDiff line change
@@ -1,4 +1,4 @@
1-
,,value,unit,source,further description,currency_year
1+
technology,parameter,value,unit,source,further description,currency_year
22
Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0
33
Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,
44
Ammonia cracker,investment,730041.5232,EUR/MW_H2,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 6.","Calculated. For a small (200 t_NH3/d input) facility. Base cost for facility: 51 MEUR at capacity 20 000m^3_NH3/h = 339 t_NH3/d input. Cost scaling exponent 0.67. Ammonia density 0.7069 kg/m^3. Conversion efficiency of cracker: 0.685. Ammonia LHV: 5.167 MWh/t_NH3.; and

outputs/costs_2050.csv

+1-1
Original file line numberDiff line numberDiff line change
@@ -1,4 +1,4 @@
1-
,,value,unit,source,further description,currency_year
1+
technology,parameter,value,unit,source,further description,currency_year
22
Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0
33
Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,
44
Ammonia cracker,investment,582504.442,EUR/MW_H2,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 6.","Calculated. For a small (200 t_NH3/d input) facility. Base cost for facility: 51 MEUR at capacity 20 000m^3_NH3/h = 339 t_NH3/d input. Cost scaling exponent 0.67. Ammonia density 0.7069 kg/m^3. Conversion efficiency of cracker: 0.685. Ammonia LHV: 5.167 MWh/t_NH3.; and

scripts/compile_cost_assumptions.py

+7-5
Original file line numberDiff line numberDiff line change
@@ -27,8 +27,10 @@
2727

2828
import pandas as pd
2929
import numpy as np
30-
pd.set_option('future.no_silent_downcasting', True)
31-
30+
try:
31+
pd.set_option('future.no_silent_downcasting', True)
32+
except Exception:
33+
pass
3234
# ---------- sources -------------------------------------------------------
3335
source_dict = {
3436
'DEA': 'Danish Energy Agency',
@@ -48,7 +50,7 @@
4850
# home battery storage and inverter investment costs
4951
"EWG": "Global Energy System based on 100% Renewable Energy, Energywatchgroup/LTU University, 2019",
5052
"HyNOW" : "Zech et.al. DBFZ Report Nr. 19. Hy-NOW - Evaluierung der Verfahren und Technologien für die Bereitstellung von Wasserstoff auf Basis von Biomasse, DBFZ, 2014",
51-
# efficiencies + lifetime SMR / SMR + CC
53+
# efficiencies + lifetime SMR / SMR + CC
5254
"IEA": "IEA Global average levelised cost of hydrogen production by energy source and technology, 2019 and 2050 (2020), https://www.iea.org/data-and-statistics/charts/global-average-levelised-cost-of-hydrogen-production-by-energy-source-and-technology-2019-and-2050",
5355
# SMR capture rate
5456
"Timmerberg": "Hydrogen and hydrogen-derived fuels through methane decomposition of natural gas – GHG emissions and costs Timmerberg et al. (2020), https://doi.org/10.1016/j.ecmx.2020.100043",
@@ -58,8 +60,8 @@
5860
"Breede2015": "Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/",
5961
# Study of deep geothermal systems in the Northern Upper Rhine Graben
6062
"Frey2022": "Frey et al. 2022: Techno-Economic Assessment of Geothermal Resources in the Variscan Basement of the Northern Upper Rhine Graben",
61-
# vehicles
62-
"vehicles" : "PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html"
63+
# vehicles
64+
"vehicles" : "PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html"
6365
}
6466

6567
# [DEA-sheet-names]

0 commit comments

Comments
 (0)