You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: inputs/manual_input.csv
+3-3Lines changed: 3 additions & 3 deletions
Original file line number
Diff line number
Diff line change
@@ -725,9 +725,9 @@ H2 production biomass gasification CC,VOM,2020,0.46,EUR/MWh_H2,2010,"JRC, 01_JRC
725
725
grey methanol synthesis,efficiency,2030,0.569,MWh_MeOH/MWh_gas,2020,"From https://www.sciencedirect.com/science/article/pii/S0016236119311767, table 2, Methanol Synthesis with integrated autothermal reforming. Efficiency is the exergetic efficiency ",
726
726
grey methanol synthesis,carbondioxide-output,2030,0.0567742,t_CO2/MWh_gas,2020,"Calculated from the carbon content of gas (0.198 t_CO2/MWh) compared to the carbon content of MeOH (0.2482 t_CO2/MWh)",
727
727
grey methanol synthesis,investment,2030,1001188,EUR/MW_MeOH,2020,"Calculated from https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2021/Jan/IRENA_Innovation_Renewable_Methanol_2021.pdf) Table 25 with an exchange rate of 0.8775 EUR/USD and energy content of 5.528 MWh_MeOH/t_MeOH",
728
-
Afforestation,lifetime,2025,30,years,-,"https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, (young forest age 0-30 y)",
729
-
Afforestation,FOM,2025,5,%/year,2020,"https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515 (recalculated from maintenance cost and assumption on investment)",
730
-
Afforestation,investment,2025,7749,EUR/ha,2020,"https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515 (assumed to be 1/3 of the upper bound for active restoration costs)",
728
+
Afforestation,lifetime,2025,30,years,-,"https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515"," general assumption on duration of fast-growth phase for new forests"
729
+
Afforestation,FOM,2025,5,%/year,2020,"https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515","recalculated from the maintenance cost for the assumption on the investment"
730
+
Afforestation,investment,2025,7749,EUR/ha,2020,"https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515","assumed to be 1/3 of the upper bound for the range of active restoration costs"
731
731
oil,fuel,2020,21.3,EUR/MWh,2020,"World Bank (2025) Commodity Markets, https://www.worldbank.org/en/research/commodity-markets","average monthly prices, 1 MWh = 0.564 BBL, 0.85 USD/EUR, +5% markup for heavy oil"
732
732
oil,fuel,2025,34.2,EUR/MWh,2025,"World Bank (2025) Commodity Markets, https://www.worldbank.org/en/research/commodity-markets","average monthly prices, 1 MWh = 0.564 BBL, 0.836 USD/EUR, +5% markup for heavy oil"
733
733
oil,fuel,2030,34.7,EUR/MWh,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh, heavy oil, modelled from crude oil price (+5%)"
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
3
+
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,assumed to be 1/3 of the upper bound for the range of active restoration costs,2020.0,,
4
+
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
5
5
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
6
6
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
7
7
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
3
+
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,assumed to be 1/3 of the upper bound for the range of active restoration costs,2020.0,,
4
+
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
5
5
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
6
6
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
7
7
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
3
+
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,assumed to be 1/3 of the upper bound for the range of active restoration costs,2020.0,,
4
+
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
5
5
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
6
6
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
7
7
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
3
+
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,assumed to be 1/3 of the upper bound for the range of active restoration costs,2020.0,,
4
+
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
5
5
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
6
6
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
7
7
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
3
+
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,assumed to be 1/3 of the upper bound for the range of active restoration costs,2020.0,,
4
+
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
5
5
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
6
6
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
7
7
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
3
+
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,assumed to be 1/3 of the upper bound for the range of active restoration costs,2020.0,,
4
+
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
5
5
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
6
6
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
7
7
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
3
+
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,assumed to be 1/3 of the upper bound for the range of active restoration costs,2020.0,,
4
+
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
5
5
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
6
6
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
7
7
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0
3
+
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,assumed to be 1/3 of the upper bound for the range of active restoration costs,2020.0
4
+
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,
5
5
Alkaline electrolyzer large size,FOM,6.4,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
6
6
Alkaline electrolyzer large size,VOM,0.7799,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
7
7
Alkaline electrolyzer large size,electricity-input,1.5,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0
3
+
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,assumed to be 1/3 of the upper bound for the range of active restoration costs,2020.0
4
+
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,
5
5
Alkaline electrolyzer large size,FOM,4.6,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
6
6
Alkaline electrolyzer large size,VOM,0.3033,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
7
7
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
0 commit comments