Skip to content

Commit c30d0e0

Browse files
fneumeuronion
andauthored
update fossil/nuclear fuel prices as in TYNDP 2024 (#259)
* update fossil/nuclear fuel prices as in TYNDP 2024 * Update inputs/manual_input.csv Co-authored-by: Johannes HAMPP <42553970+euronion@users.noreply.github.com> * Update inputs/manual_input.csv Co-authored-by: Johannes HAMPP <42553970+euronion@users.noreply.github.com> * Update docs/release_notes.rst Co-authored-by: Johannes HAMPP <42553970+euronion@users.noreply.github.com> * update output files --------- Co-authored-by: Johannes HAMPP <42553970+euronion@users.noreply.github.com>
1 parent 1649251 commit c30d0e0

17 files changed

+75
-62
lines changed

docs/release_notes.rst

Lines changed: 2 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -16,6 +16,8 @@ Upcoming Release
1616
.. The features listed below are not released yet, but will be part of the next release!
1717
.. To use the features already you have to use the ``master`` branch.
1818
19+
* Update fossil fuel (gas, oil, lignite) and nuclear fuel (nuclear, uranium) costs based on TYNDP 2024 scenarios data.
20+
1921
* Adding `grey methanol synthesis`.
2022

2123
* Align cost units for NREL battery data with PyPSA modeling, fetching investment cost and FOM for both `battery storage` and `battery inverter` instead of a single value for `battery storage`, which was instead representative of the full plant (battery storage + battery inverter).

inputs/costs_PyPSA.csv

Lines changed: 0 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -48,7 +48,6 @@ oil,2030,VOM,3,EUR/MWhel,DIW DataDoc http://hdl.handle.net/10419/80348
4848
biomass,2030,fuel,7,EUR/MWhth,IEA2011b
4949
biogas,2030,fuel,59,EUR/MWhth,JRC and Zappa
5050
solid biomass,2030,fuel,25.2,EUR/MWhth,JRC and Zappa
51-
oil,2030,fuel,50,EUR/MWhth,IEA WEM2017 97USD/boe = http://www.iea.org/media/weowebsite/2017/WEM_Documentation_WEO2017.pdf
5251
PHS,2030,efficiency,0.75,per unit,DIW DataDoc http://hdl.handle.net/10419/80348
5352
hydro,2030,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348
5453
ror,2030,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348

inputs/manual_input.csv

Lines changed: 17 additions & 5 deletions
Original file line numberDiff line numberDiff line change
@@ -353,21 +353,28 @@ nuclear,FOM,2020,1.27,%/year,2023,"Lazard's levelized cost of energy analysis -
353353
nuclear,VOM,2020,4.24,EUR/MWh_e,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","U.S. specific costs including newly commissioned Vogtle plant, average of range and currency converted, i.e. (4.25+5)/2 USD/kW_e / (1.09 USD/EUR) ."
354354
nuclear,lifetime,2020,40,years,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",
355355
nuclear,efficiency,2020,0.326,p.u.,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Based on heat rate of 10.45 MMBtu/MWh_e and 3.4095 MMBtu/MWh_th, i.e. 1/(10.45/3.4095) = 0.3260."
356-
nuclear,fuel,2020,3,EUR/MWh_th,2010,"DIW (2013): Current and propsective costs of electricity generation until 2050, http://hdl.handle.net/10419/80348 , pg. 80 text below figure 10, accessed: 2023-12-14.",Based on IEA 2011 data.
357-
uranium,fuel,2020,3,EUR/MWh_th,2010,"DIW (2013): Current and propsective costs of electricity generation until 2050, http://hdl.handle.net/10419/80348 , pg. 80 text below figure 10, accessed: 2023-12-14.",Based on IEA 2011 data.
356+
nuclear,fuel,2030,6.1,EUR/MWh_th,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on EIA (2022) data, 3.6 GJ/MWh."
357+
uranium,fuel,2030,6.1,EUR/MWh_th,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on EIA (2022) data, 3.6 GJ/MWh."
358+
nuclear,fuel,2050,6.1,EUR/MWh_th,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on EIA (2022) data, 3.6 GJ/MWh."
359+
uranium,fuel,2050,6.1,EUR/MWh_th,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on EIA (2022) data, 3.6 GJ/MWh."
358360
coal,investment,2020,4575.69,EUR/kW_e,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Higher costs include coal plants with CCS, but since using here for calculating the average nevertheless. Calculated based on average of listed range, i.e. (3200+6775) USD/kW_e/2 / (1.09 USD/EUR)."
359361
coal,FOM,2020,1.31,%/year,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. (39.5+91.25) USD/kW_e/a /2 / (1.09 USD/EUR) / investment cost * 100."
360362
coal,VOM,2020,3.89908256880734,EUR/MWh_e,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. (3+5.5)USD/MWh_e/2 / (1.09 USD/EUR)."
361363
coal,lifetime,2020,40,years,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",
362364
coal,efficiency,2020,0.356,p.u.,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. 1 / ((8.75+12) MMbtu/MWh_th /2 / (3.4095 MMbtu/MWh_th)), rounded up."
363-
coal,fuel,2020,8.4,EUR/MWh_th,2010,"DIW (2013): Current and propsective costs of electricity generation until 2050, http://hdl.handle.net/10419/80348 , pg. 80 text below figure 10, accessed: 2023-12-14.","Based on IEA 2011 data, 99 USD/t."
365+
coal,fuel,2030,6.4,EUR/MWh_th,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh"
366+
coal,fuel,2040,5.9,EUR/MWh_th,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh"
367+
coal,fuel,2050,5.5,EUR/MWh_th,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh"
364368
lignite,investment,2020,4575.69,EUR/kW_e,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Higher costs include coal plants with CCS, but since using here for calculating the average nevertheless. Calculated based on average of listed range, i.e. (3200+6775) USD/kW_e/2 / (1.09 USD/EUR). Note: Assume same costs as for hard coal, as cost structure is apparently comparable, see https://diglib.tugraz.at/download.php?id=6093e88b63f93&location=browse and https://iea.blob.core.windows.net/assets/ae17da3d-e8a5-4163-a3ec-2e6fb0b5677d/Projected-Costs-of-Generating-Electricity-2020.pdf ."
365369
lignite,FOM,2020,1.31,%/year,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. (39.5+91.25) USD/kW_e/a /2 / (1.09 USD/EUR) / investment cost * 100. Note: Assume same costs as for hard coal, as cost structure is apparently comparable, see https://diglib.tugraz.at/download.php?id=6093e88b63f93&location=browse and https://iea.blob.core.windows.net/assets/ae17da3d-e8a5-4163-a3ec-2e6fb0b5677d/Projected-Costs-of-Generating-Electricity-2020.pdf . "
366370
lignite,VOM,2020,3.89908256880734,EUR/MWh_e,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. (3+5.5)USD/MWh_e/2 / (1.09 USD/EUR). Note: Assume same costs as for hard coal, as cost structure is apparently comparable, see https://diglib.tugraz.at/download.php?id=6093e88b63f93&location=browse and https://iea.blob.core.windows.net/assets/ae17da3d-e8a5-4163-a3ec-2e6fb0b5677d/Projected-Costs-of-Generating-Electricity-2020.pdf . "
367371
lignite,lifetime,2020,40,years,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Note: Assume same costs as for hard coal, as cost structure is apparently comparable, see https://diglib.tugraz.at/download.php?id=6093e88b63f93&location=browse and https://iea.blob.core.windows.net/assets/ae17da3d-e8a5-4163-a3ec-2e6fb0b5677d/Projected-Costs-of-Generating-Electricity-2020.pdf . "
368372
lignite,efficiency,2020,0.33,p.u.,2023,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. 1 / ((8.75+12) MMbtu/MWh_th /2 / (3.4095 MMbtu/MWh_th)), rounded up. Note: Assume same costs as for hard coal, as cost structure is apparently comparable, see https://diglib.tugraz.at/download.php?id=6093e88b63f93&location=browse and https://iea.blob.core.windows.net/assets/ae17da3d-e8a5-4163-a3ec-2e6fb0b5677d/Projected-Costs-of-Generating-Electricity-2020.pdf . "
369-
lignite,fuel,2020,2.9,EUR/MWh_th,2010,"DIW (2013): Current and propsective costs of electricity generation until 2050, http://hdl.handle.net/10419/80348 , pg. 80 text below figure 10, accessed: 2023-12-14.","Based on IEA 2011 data, 10 USD/t."
370-
gas,fuel,2020,21.6,EUR/MWh_th,2010,"DIW (2013): Current and propsective costs of electricity generation until 2050, http://hdl.handle.net/10419/80348 , pg. 80 text below figure 10, accessed: 2023-12-14.",Based on IEA 2011 data.
373+
lignite,fuel,2030,6.5,EUR/MWh_th,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on Booze&co data, 3.6 GJ/MWh, Lignite G2 (SK - DE - RS - PL - ME - UKNI - BA - IE)."
374+
gas,fuel,2020,9.248,EUR/MWh_th,2020,"World Bank (2025) Commodity Markets, https://www.worldbank.org/en/research/commodity-markets","average monthly prices, 1 MWh = 3.412142 MMBTU, 0.85 USD/EUR"
375+
gas,fuel,2025,34.12,EUR/MWh_th,2025,"World Bank (2025) Commodity Markets, https://www.worldbank.org/en/research/commodity-markets","average monthly prices, 1 MWh = 3.412142 MMBTU, 0.836 USD/EUR"
376+
gas,fuel,2030,22.6,EUR/MWh_th,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh"
377+
gas,fuel,2050,18.1,EUR/MWh_th,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh"
371378
organic rankine cycle,lifetime,2020,30,years,2020,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551",
372379
organic rankine cycle,electricity-input,2020,0.12,MWh_el/MWh_th,2020,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, Electricity-output. This is a rough estimate, depends on input temperature, implies ~150 C."
373380
organic rankine cycle,FOM,2020,2,%/year,2020,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551","Both for flash, binary and ORC plants. See Supplemental Material for details"
@@ -623,3 +630,8 @@ H2 production biomass gasification CC,VOM,2020,0.46,EUR/MWh_H2,2010,"JRC, 01_JRC
623630
grey methanol synthesis,efficiency,2030,0.569,MWh_MeOH/MWh_gas,2020,"From https://www.sciencedirect.com/science/article/pii/S0016236119311767, table 2, Methanol Synthesis with integrated autothermal reforming. Efficiency is the exergetic efficiency ",
624631
grey methanol synthesis,carbondioxide-output,2030,0.0567742,t_CO2/MWh_gas,2020,"Calculated from the carbon content of gas (0.198 t_CO2/MWh) compared to the carbon content of MeOH (0.2482 t_CO2/MWh)",
625632
grey methanol synthesis,investment,2030,1001188,EUR/MW_MeOH,2020,"Calculated from https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2021/Jan/IRENA_Innovation_Renewable_Methanol_2021.pdf) Table 25 with an exchange rate of 0.8775 EUR/USD and energy content of 5.528 MWh_MeOH/t_MeOH",
633+
oil,fuel,2020,21.3,EUR/MWh,2020,"World Bank (2025) Commodity Markets, https://www.worldbank.org/en/research/commodity-markets","average monthly prices, 1 MWh = 0.564 BBL, 0.85 USD/EUR, +5% markup for heavy oil"
634+
oil,fuel,2025,34.2,EUR/MWh,2025,"World Bank (2025) Commodity Markets, https://www.worldbank.org/en/research/commodity-markets","average monthly prices, 1 MWh = 0.564 BBL, 0.836 USD/EUR, +5% markup for heavy oil"
635+
oil,fuel,2030,34.7,EUR/MWh,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh, heavy oil, modelled from crude oil price (+5%)"
636+
oil,fuel,2040,33.6,EUR/MWh,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh, heavy oil, modelled from crude oil price (+5%)"
637+
oil,fuel,2050,32.5,EUR/MWh,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh, heavy oil, modelled from crude oil price (+5%)"

0 commit comments

Comments
 (0)