You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: docs/release_notes.rst
+2Lines changed: 2 additions & 0 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -16,6 +16,8 @@ Upcoming Release
16
16
.. The features listed below are not released yet, but will be part of the next release!
17
17
.. To use the features already you have to use the ``master`` branch.
18
18
19
+
* Update electricity transmission and offshore wind connection costs based on latest DEA data (https://ens.dk/en/analyses-and-statistics/technology-data-transport-energy, July 2025).
20
+
Align unit costs of offshore wind connection and general transmission. For offshore wind connections, include missing FOM.
19
21
* Changed currency year from 2020 to 2025 for all cost assumptions using updated Eurostat inflation rates.
20
22
21
23
* Update fossil fuel (gas, oil, lignite) and nuclear fuel (nuclear, uranium) costs based on TYNDP 2024 scenarios data.
offwind-dc-station,2030,investment,400,EUR/kWel,Haertel 2017; assuming one onshore and one offshore node + 13% learning reduction
197
-
offwind-dc-connection-submarine,2030,investment,2000,EUR/MW/km,DTU report based on Fig 34 of https://ec.europa.eu/energy/sites/ener/files/documents/2014_nsog_report.pdf
198
-
offwind-dc-connection-underground,2030,investment,1000,EUR/MW/km,Haertel 2017; average + 13% learning reduction
0 commit comments