Skip to content

Add --hip-link to target_id check #1258

Add --hip-link to target_id check

Add --hip-link to target_id check #1258

Triggered via pull request August 19, 2025 21:49
@lamb-jlamb-j
synchronize #275
lamb-j-patch-1
Status Failure
Total duration 1m 36s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (ubuntu-24.04, 3.16.3)
Process completed with exit code 1.
test (windows-2022, 3.31.0)
The operation was canceled.
test (windows-2022, 3.31.0)
The strategy configuration was canceled because "test.ubuntu-24_04_3_16_3" failed
test (ubuntu-24.04, 3.22.1)
The operation was canceled.
test (ubuntu-24.04, 3.22.1)
The strategy configuration was canceled because "test.ubuntu-24_04_3_16_3" failed
test (ubuntu-24.04, 3.31.0)
The operation was canceled.
test (ubuntu-24.04, 3.31.0)
The strategy configuration was canceled because "test.ubuntu-24_04_3_16_3" failed