Skip to content

🐛 add data to repo as upstream removed CSVs #195

🐛 add data to repo as upstream removed CSVs

🐛 add data to repo as upstream removed CSVs #195

Triggered via push September 18, 2025 19:29
Status Failure
Total duration 1m 45s
Artifacts

packaging.yml

on: push
Matrix: Test
Check formatting
16s
Check formatting
Lint
15s
Lint
Build source distribution
0s
Build source distribution
Publish package
0s
Publish package
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Lint
Process completed with exit code 1.
Test (3.11, py311)
Process completed with exit code 1.
Test (3.10, py310)
The operation was canceled.
Test (3.10, py310)
The strategy configuration was canceled because "test._3_11_py311" failed
Test (3.9, py39)
The operation was canceled.
Test (3.9, py39)
The strategy configuration was canceled because "test._3_11_py311" failed
Test (3.12, py312)
The operation was canceled.
Test (3.12, py312)
The strategy configuration was canceled because "test._3_11_py311" failed