ci #14
ci.yml
on: pull_request
build-macos
6m 40s
Matrix: build-and-test-linux
Annotations
7 errors and 3 warnings
|
build-and-test-linux (Debug, true)
Process completed with exit code 2.
|
|
build-and-test-linux (Release, true)
The operation was canceled.
|
|
build-and-test-linux (Release, true)
The strategy configuration was canceled because "build-and-test-linux.Debug_true" failed
|
|
build-and-test-linux (Release, false)
The operation was canceled.
|
|
build-and-test-linux (Release, false)
The strategy configuration was canceled because "build-and-test-linux.Debug_true" failed
|
|
build-and-test-linux (Debug, false)
The operation was canceled.
|
|
build-and-test-linux (Debug, false)
The strategy configuration was canceled because "build-and-test-linux.Debug_true" failed
|
|
build-macos
readline 8.2.13 is already installed and up-to-date.
To reinstall 8.2.13, run:
brew reinstall readline
|
|
build-macos
gmp 6.3.0 is already installed and up-to-date.
To reinstall 6.3.0, run:
brew reinstall gmp
|
|
build-macos
Treating cmake as a formula. For the cask, use homebrew/cask/cmake-app or specify the `--cask` flag. To silence this message, use the `--formula` flag.
|