Skip to content

chore(v0.4.0): multi-cluster integration #28

chore(v0.4.0): multi-cluster integration

chore(v0.4.0): multi-cluster integration #28

Triggered via push December 18, 2025 08:32
Status Failure
Total duration 2m 32s
Artifacts

ci.yaml

on: push
Matrix: test
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (1.21.x, macos-latest)
Process completed with exit code 201.
test (1.21.x, windows-latest)
The strategy configuration was canceled because "test._1_21_x_macos-latest" failed
test (1.21.x, windows-latest)
The operation was canceled.
test (1.21.x, ubuntu-latest)
The strategy configuration was canceled because "test._1_21_x_macos-latest" failed
test (1.21.x, ubuntu-latest)
The operation was canceled.
Lint
The operation was canceled.