Skip to content

chore(v0.5.0): feature sync and pipeline fixes #29

chore(v0.5.0): feature sync and pipeline fixes

chore(v0.5.0): feature sync and pipeline fixes #29

Triggered via push January 9, 2026 10:07
Status Failure
Total duration 1m 25s
Artifacts

ci.yaml

on: push
Matrix: test
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Lint
Process completed with exit code 201.
Task 'lint' failed
exit status 3
test (1.21.x, ubuntu-latest)
Process completed with exit code 201.
Task 'test:integration' failed
exit status 1
test (1.21.x, windows-latest)
The strategy configuration was canceled because "test._1_21_x_ubuntu-latest" failed
test (1.21.x, windows-latest)
The operation was canceled.
test (1.21.x, macos-latest)
The strategy configuration was canceled because "test._1_21_x_ubuntu-latest" failed
test (1.21.x, macos-latest)
The operation was canceled.