chore(deps): update dev dependencies (major) #8357
Annotations
9 errors and 1 notice
|
build (24)
Process completed with exit code 2.
|
|
build (20)
The strategy configuration was canceled because "build._24" failed
|
|
mongo-compatibility (6)
Process completed with exit code 2.
|
|
build (22)
The strategy configuration was canceled because "build._24" failed
|
|
build (22)
The operation was canceled.
|
|
mongo-compatibility (5)
The strategy configuration was canceled because "mongo-compatibility._6" failed
|
|
mongo-compatibility (5)
The operation was canceled.
|
|
mongo-compatibility (7)
The strategy configuration was canceled because "mongo-compatibility._6" failed
|
|
mongo-compatibility (7)
The operation was canceled.
|
|
deserialize:
biome.json#L2
The configuration schema version does not match the CLI version 2.4.12
|