Skip to content

chore: Clean up some connector schemas in the overlay file (#247) #622

chore: Clean up some connector schemas in the overlay file (#247)

chore: Clean up some connector schemas in the overlay file (#247) #622

Triggered via push March 20, 2025 22:00
Status Cancelled
Total duration 36m 16s
Artifacts

ci.yaml

on: push
Matrix: test_contract
Matrix: test_integration
Matrix: test_unit
Fit to window
Zoom out
Zoom in

Annotations

13 errors
lint
Process completed with exit code 2.
test_contract (3.11)
Process completed with exit code 2.
test_contract (3.10)
Process completed with exit code 2.
test_contract (3.12)
The job was canceled because "_3_11" failed.
test_contract (3.12)
Process completed with exit code 2.
test_contract (3.9)
The job was canceled because "_3_11" failed.
test_contract (3.9)
Process completed with exit code 2.
test_integration (3.10)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
test_integration (3.10)
The operation was canceled.
test_integration (3.9)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
test_integration (3.9)
The operation was canceled.
test_integration (3.11)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
test_integration (3.11)
The operation was canceled.