Skip to content

Add required packaging and pipeline tools. Update Conan #51

Add required packaging and pipeline tools. Update Conan

Add required packaging and pipeline tools. Update Conan #51

Triggered via push July 2, 2025 04:10
Status Failure
Total duration 1m 36s
Artifacts 1

rhel.yml

on: push
Matrix: build
Matrix: merge
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (linux/amd64, ubuntu-24.04, 9.6, gcc, 13)
The strategy configuration was canceled because "build.linux_amd64_ubuntu-24_0_2" failed
build (linux/amd64, ubuntu-24.04, 9.6, gcc, 14)
buildx failed with: ERROR: failed to build: failed to solve: process "/bin/bash -c pipx install conan==${CONAN_VERSION} && pipx install gcovr==${GCOVR_VERSION}" did not complete successfully: exit code: 127
build (linux/arm64, ubuntu-24.04-arm, 9.6, gcc, 13)
The strategy configuration was canceled because "build.linux_amd64_ubuntu-24_0_2" failed
build (linux/arm64, ubuntu-24.04-arm, 9.6, clang, any)
The strategy configuration was canceled because "build.linux_amd64_ubuntu-24_0_2" failed
build (linux/amd64, ubuntu-24.04, 9.6, clang, any)
The strategy configuration was canceled because "build.linux_amd64_ubuntu-24_0_2" failed
build (linux/arm64, ubuntu-24.04-arm, 9.6, gcc, 14)
The operation was canceled.
build (linux/arm64, ubuntu-24.04-arm, 9.6, gcc, 14)
The strategy configuration was canceled because "build.linux_amd64_ubuntu-24_0_2" failed

Artifacts

Produced during runtime
Name Size Digest
XRPLF~ci~B6AT8I.dockerbuild Expired
33.2 KB
sha256:9ebb21382d2f32c57d1eda4c3924abf40a85952fa681a665887c800499699fcb