ADR-0027 — The ADR-0021 hold is over: both of its indicators are met

  • Status: Accepted
  • Date: 4 August 2026
  • Owner's rule: 4 August 2026 — "carry on analysing and acting on the recommendations, in sync with the ahliweb/awcms backend repo."
  • Supersedes: ADR-0021
  • Related: ADR-0023 (the test that still applies), awcms ADR-0059, awcms ADR-0060

Context

ADR-0021 held development of this repo "until the awcms foundation is finished" and — because "finished" had no formal definition — wrote down two checkable indicators along with the risk it accepted: "this hold could last longer than intended without anyone noticing. If both are at zero and the hold is still in force, that is a question worth raising, not a state to be left alone."

Both are now at zero.

Indicator State Evidence
Every awcms module has a screen Met 3 Aug 2026 grep -L 'navigation:' src/modules/*/module.ts → zero lines
§4 "outstanding" of PROJECT_STATE is empty Met 4 Aug 2026 ADR-0059 (host-resolved routes), ADR-0060 (the business-scope provider)

What closed the second indicator was not a reading from this side. awcms analysed this repo's readiness against the CODE — not against its list — and concluded that this repo touches only five surfaces, all five complete, then closed the one genuine gap it found (GET /api/v1/media/public-origin, #370). Its closing sentence: "What remains AND belongs to this repo: zero."

The unabsorbed remains of awcms-micro — newsletter, social-publishing, the src/components/ui/ library — are still absent, and not one of them blocks this repo. That too is awcms's conclusion, not a judgement from here.

Decision

The ADR-0021 hold is over. It was not lifted early and not left hanging: the criteria it wrote for itself are met.

What replaces it: the ADR-0023 test, unchanged

ADR-0023 already narrowed the hold to a single question, and that question still applies after this ADR:

Would this change be rewritten if awcms changed?

Only its premise changes. While ADR-0021 was in force, "yes" meant held until the foundation is finished. Now "yes" means it needs an awcms instance to prove its calls are right before it lands — the same boundary, a different reason, and the second reason will never expire.

ADR-0023's explicit boundary does not change either: "the endpoint already exists" is not an answer of "no".

What is still held, and by what

The Jualanku portal BFF (ADR-0014). Not by ADR-0021 — by the ADR-0023 test: it calls awcms on every runtime request, not once per build, so its shape is decided by an awcms response on every request. Its session contract has landed (awcms ADR-0049/0050) and the business-scope resolver now has a provider (ADR-0060), but the shape of the Jualanku merchant scope itself still needs an admission ADR in awcms.

What does NOT change

  • Every gate: bun run check, bun test, bun run audit:konten, bun run audit:dokumen, a changeset, and an ADR for a decision that belongs on the docs/adr/README.md list.
  • Security patches and dependency bumps still land, as they did during the hold.
  • ADR-0021 is still read as a historical record — it explains why this repo went quiet for two days, and its reasoning was correct when it was written.

Consequences

  • The backlog stops waiting on something. What remains in README.md is two items, and both wait on a decision rather than a contract: generated share cards (an image encoder dependency → its own ADR) and the portal BFF (above).
  • The risk ADR-0021 accepted did not occur. The hold lasted two days, not months, and what ended it was the indicator it wrote for itself — not somebody who happened to remember.
  • A new accepted risk: "the contract is complete" is awcms's conclusion as of 4 August 2026, not a permanent property. A sixth surface this repo calls one day may well not exist over there; the ADR-0023 test is what catches that, and that is why the test was not withdrawn along with the hold.

Alternatives considered

  • Leaving ADR-0021 in force until awcms genuinely finishes all of its §4 — refused: §4 contains the awcms-micro absorption programme and an e-commerce trajectory that were never this repo's contract. Waiting for it means waiting on work that never blocked anything here, and that is precisely the risk ADR-0021 wrote down as its own worry.
  • Withdrawing the ADR-0023 test as well — refused: that test was never about awcms's readiness, but about whether this template repo can PROVE a call is right. It still has no instance.
  • Declaring the hold lifted without an ADR — refused: ADR-0021 is a written decision, and a written decision is withdrawn in writing. Six months from now "why did this repo stop for two days and then start again" must have a readable answer.