Skip to content

Merge branch 'argoproj-labs:master' into master #34

Merge branch 'argoproj-labs:master' into master

Merge branch 'argoproj-labs:master' into master #34

Triggered via push June 29, 2026 15:08
Status Failure
Total duration 1h 36m 4s
Artifacts 2

ci-build.yaml

on: push
Matrix: Run end-to-end tests
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 3 warnings
Run end-to-end tests (v1.33.5-k3s1)
Process completed with exit code 2.
Run end-to-end tests (v1.27.1-k3s1)
The strategy configuration was canceled because "test-e2e.v1_33_5-k3s1" failed
Run end-to-end tests (v1.27.1-k3s1)
The operation was canceled.
Run end-to-end tests (v1.33.5-k3s1)
No files were found with the provided path: /tmp/pods.log. No artifacts will be uploaded.
Run end-to-end tests (v1.33.5-k3s1)
No files were found with the provided path: /tmp/e2e-server.log. No artifacts will be uploaded.
Run end-to-end tests (v1.33.5-k3s1)
No files were found with the provided path: /tmp/e2e-application-controller.log. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size Digest
e2e-operator-run-v1.33.5-k3s1.log
490 KB
sha256:717e9155504ffe4de22343c8026bd197ba440bc065cd4e9864fd5fde99e01cbb
e2e-test-v1.33.5-k3s1.log
28.8 KB
sha256:846a92954198e258b78d622196ced28885d5c104915c833a8a6d1748e70f1e5f