Tracker for genuine future work that doesn't justify hands-on time right now. Each child issue has a specific re-evaluation trigger.
Issues + re-eval triggers
| # |
Story |
Re-eval trigger |
| #195 |
V11-B quantile-based scenario perturbations |
When ENERGY_STRATEGY_MODE flips to `savings_first` for peak-export (currently strict_savings — see memory `feedback_near_zero_grid_cost_policy`) |
| #197 |
V11-D occupancy inference |
If you stop using the manual `PLAN_GUESTS_TODAY` flag and want auto-detect (#161 should land first) |
| #275 |
auto-set ENERGY_STRATEGY_MODE from OPTIMIZATION_PRESET |
If you start switching presets often enough to want the coupling automated |
| #263 |
Split heat-pump deviation from base load in MPC tracker |
If brief audit shows recurring `load_upside` re-plans that turn out to be HP-driven (then split the axis) |
| #336 |
PV calibration by solar elevation buckets |
If observed structural sunrise/sunset PV bias survives the hour-of-day cal |
| #322 |
Conditional shutdown commit |
Oct 2026 (deferred per memory `project_2026_05_11_climate_strip_incident` — below 10% saving bar) |
| #309 |
Dispatch starvation when Daikin quota tight |
After 30 days of post-Phase-A heartbeat decouple data; tune reserve only if quota burns recur |
| #261 |
Quartz adapter → open.quartz.solar HTTPS |
When Quartz publishes site-level HTTPS (current EB-HTTP workaround is stable) |
| #184 |
Daikin tank reheat anomaly detection |
If a post-active-flip incident makes diagnostic value tangible |
Why park, not close
Each is real future work, just not the highest-leverage thing on the board today. Closing them would lose the context that made them worth filing.
Definition of done
This epic auto-closes when all children either ship (move to Tier 1/2 first) or get explicitly re-deferred to a later date. Don't pick these up just because they're in scope; pick them when their re-eval trigger fires.
Tracker for genuine future work that doesn't justify hands-on time right now. Each child issue has a specific re-evaluation trigger.
Issues + re-eval triggers
Why park, not close
Each is real future work, just not the highest-leverage thing on the board today. Closing them would lose the context that made them worth filing.
Definition of done
This epic auto-closes when all children either ship (move to Tier 1/2 first) or get explicitly re-deferred to a later date. Don't pick these up just because they're in scope; pick them when their re-eval trigger fires.