Skip to content

MkDocs #120

@zenzeii

Description

@zenzeii

User story

  1. As a {}
  2. I want / need {}
  3. So that {}

Acceptance criteria

  • Criterion 1
  • Criterion 2
  • ...

Definition of done (DoD)

  • Acceptance criteria are met.
  • Work are pushed to the Github repository.
  • Create a branch for each backlog items (coding)
  • A pull request is created for each related branch.
  • The work products in the pull requests are reviewed.
  • The corresponding branches are merged and closed.
  • The bill of materials section of the planning documents is updated.
  • The software architecture should be updated based on features changes.
  • Work needs to be documented in the corresponding wiki section
  • For new features unit test have to be written.
  • Update our forked repository with the latest RTDIP release.
  • All unit tests must pass successfully in the CI pipeline.
  • If the task involves coding, the implementation is integrated into the RTDIP framework and verified to function correctly within it.

DoD general criteria

  • Feature has been fully implemented
  • Feature has been merged into the mainline
  • All acceptance criteria were met
  • Product owner approved features
  • All tests are passing
  • Developers agreed to release

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions